Current through Bulletin No. 2024-21, November 1, 2024
Section R315-319-91 - Groundwater Monitoring and Corrective Action - Groundwater Monitoring Systems(a) Performance standard. The owner or operator of a CCR unit shall install a groundwater monitoring system consists of a sufficient number of wells, installed at appropriate locations and depths, to yield groundwater samples from the uppermost aquifer that:(1) Accurately represent the quality of background groundwater that has not been affected by leakage from a CCR unit. A determination of background quality may include sampling of wells that are not hydraulically upgradient of the CCR management area where:(i) Hydrogeologic conditions do not allow the owner or operator of the CCR unit to determine what wells are hydraulically upgradient; or(ii) Sampling at other wells will provide an indication of background groundwater quality that is as representative or more representative than that provided by the upgradient wells; and(2) Accurately represent the quality of groundwater passing the waste boundary of the CCR unit. The downgradient monitoring system shall be installed at the waste boundary that ensures detection of groundwater contamination in the uppermost aquifer. All potential contaminant pathways shall be monitored.(b) The number, spacing, and depths of monitoring systems shall be determined based upon site-specific technical information that shall include thorough characterization of: (1) Aquifer thickness, groundwater flow rate, groundwater flow direction including seasonal and temporal fluctuations in groundwater flow; and(2) Saturated and unsaturated geologic units and fill materials overlying the uppermost aquifer, materials comprising the uppermost aquifer, and materials comprising the confining unit defining the lower boundary of the uppermost aquifer, including, but not limited to, thicknesses, stratigraphy, lithology, hydraulic conductivities, porosities and effective porosities.(c) The groundwater monitoring system shall include the minimum number of monitoring wells necessary to meet the performance standards specified in Subsection R315-319-91(a), based on the site-specific information specified in Subsection R315-319-91(b). The groundwater monitoring system shall contain: (1) A minimum of one upgradient and three downgradient monitoring wells; and(2) Additional monitoring wells as necessary to accurately represent the quality of background groundwater that has not been affected by leakage from the CCR unit and the quality of groundwater passing the waste boundary of the CCR unit.(d) The owner or operator of multiple CCR units may install a multiunit groundwater monitoring system instead of separate groundwater monitoring systems for each CCR unit. (1) The multiunit groundwater monitoring system shall be equally as capable of detecting monitored constituents at the waste boundary of the CCR unit as the individual groundwater monitoring system specified in Subsections R315-319-91(a) through (c) for each CCR unit based on the following factors:(i) Number, spacing, and orientation of each CCR unit;(ii) Hydrogeologic setting;(iv) Engineering design of the CCR unit.(2) If the owner or operator elects to install a multiunit groundwater monitoring system, and if the multiunit system includes at least one existing unlined CCR surface impoundment as determined by Subsection R315-319-71(a), and if at any time after October 19, 2015 the owner or operator determines in any sampling event that the concentrations of one or more constituents listed in appendix IV to Rule R315-319 are detected at statistically significant levels above the groundwater protection standard established under Subsection R315-319-95(h) for the multiunit system, then all unlined CCR surface impoundments comprising the multiunit groundwater monitoring system are subject to the closure requirements under Subsection R315-319-101(a) to retrofit or close.(e) Monitoring wells shall be cased in a manner that maintains the integrity of the monitoring well borehole. This casing shall be screened or perforated and packed with gravel or sand, where necessary, to enable collection of groundwater samples. The annular space, i.e., the space between the borehole and well casing, above the sampling depth shall be sealed to prevent contamination of samples and the groundwater. (1) The owner or operator of the CCR unit shall document and include in the operating record the design, installation, development, and decommissioning of any monitoring wells, piezometers and other measurement, sampling, and analytical devices. The qualified professional engineer shall be given access to this documentation when completing the groundwater monitoring system certification required under Subsection R315-319-91(f).(2) The monitoring wells, piezometers, and other measurement, sampling, and analytical devices shall be operated and maintained so that they perform to the design specifications throughout the life of the monitoring program.(f) The owner or operator shall obtain a certification from a qualified professional engineer stating that the groundwater monitoring system has been designed and constructed to meet the requirements of Section R315-319-91. If the groundwater monitoring system includes the minimum number of monitoring wells specified in Subsection R315-319-91(c)(1), the certification shall document the basis supporting this determination.(g) The owner or operator of the CCR unit shall comply with the recordkeeping requirements specified in Subsection R315-319-105(h), the notification requirements specified in Subsection R315-319-106(h), and the internet requirements specified in Subsection R315-319-107(h).Utah Admin. Code R315-319-91
Adopted by Utah State Bulletin Number 2016-18, effective 9/1/2016