Utah Admin. Code 315-265-115

Current through Bulletin 2024-12, June 15, 2024
Section R315-265-115 - Closure and Post-Closure - Certification of Closure

Within 60 days of completion of closure of each hazardous waste surface impoundment, waste pile, land treatment, and landfill unit, and within 60 days of completion of final closure, the owner or operator shall submit to the Director, by registered mail, a certification that the hazardous waste management unit or facility, as applicable, has been closed in accordance with the specifications in the approved closure plan. The certification shall be signed by the owner or operator and by a qualified Professional Engineer. Documentation supporting the Professional Engineer's certification shall be furnished to the Director upon request until he releases the owner or operator from the financial assurance requirements for closure under Subsection R315-265-143(h).

Utah Admin. Code R315-265-115

Adopted by Utah State Bulletin Number 2019-21, effective 10/15/2019