Current through Bulletin No. 2024-21, November 1, 2024
Section R315-264-51 - Purpose and Implementation of Contingency Plan(a) Each owner or operator shall have a contingency plan for his facility. The contingency plan shall be designed to minimize hazards to human health or the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste or hazardous waste constituents to air, soil, or surface water. (b) The provisions of the plan shall be carried out immediately whenever there is a fire, explosion, or release of hazardous waste or hazardous waste constituents which could threaten human health or the environment. Utah Admin. Code R315-264-51
Adopted by Utah State Bulletin Number 2016-9, effective 4/15/2016