Utah Admin. Code 315-264-302

Current through Bulletin No. 2024-21, November 1, 2024
Section R315-264-302 - Action Leakage Rate
(a) The Director shall approve an action leakage rate for landfill units subject to Subsections R315-264-301(c) or (d). The action leakage rate is the maximum design flow rate that the leak detection system can remove without the fluid head on the bottom liner exceeding 30.5 cm, l foot. The action leakage rate shall include an adequate safety margin to allow for uncertainties in the design, e.g., slope, hydraulic conductivity, thickness of drainage material, construction, operation, and location of the leak detection system, waste and leachate characteristics, likelihood and amounts of other sources of liquids in the leak detection system, and proposed response actions, e.g., the action leakage rate shall consider decreases in the flow capacity of the system over time resulting from siltation and clogging, rib layover and creep of synthetic components of the system, overburden pressures, etc.
(b) To determine if the action leakage rate has been exceeded, the owner or operator shall convert the weekly or monthly flow rate from the monitoring data obtained under Subsection R315-264-303(c) to an average daily flow rate, gallons per acre per day, for each sump. Unless the Director approves a different calculation, the average daily flow rate for each sump shall be calculated weekly during the active life and closure period, and monthly during the post-closure care period when monthly monitoring is required under Subsection R315-264-303(c).

Utah Admin. Code R315-264-302

Adopted by Utah State Bulletin Number 2016-9, effective 4/15/2016