Current through Bulletin 2024-23, December 1, 2024
Section R315-264-278 - Unsaturated Zone MonitoringAn owner or operator subject to Sections R315-270 through 283 shall establish an unsaturated zone monitoring program to discharge the following responsibilities:
(a) The owner or operator shall monitor the soil and soil-pore liquid to determine whether hazardous constituents migrate out of the treatment zone. (1) The Director shall specify the hazardous constituents to be monitored in the facility permit. The hazardous constituents to be monitored are those specified under Section R315-264-271(b). (2) The Director may require monitoring for principal hazardous constituents (PHCs) in lieu of the constituents specified under Section R315-264-271(b). PHCs are hazardous constituents contained in the wastes to be applied at the unit that are the most difficult to treat, considering the combined effects of degradation, transformation, and immobilization. The Director shall establish PHCs if he finds, based on waste analyses, treatment demonstrations, or other data, that effective degradation, transformation, or immobilization of the PHCs will assure treatment at at least equivalent levels for the other hazardous constituents in the wastes. (b) The owner or operator shall install an unsaturated zone monitoring system that includes soil monitoring using soil cores and soil-pore liquid monitoring using devices such as lysimeters. The unsaturated zone monitoring system shall consist of a sufficient number of sampling points at appropriate locations and depths to yield samples that: (1) Represent the quality of background soil-pore liquid quality and the chemical make-up of soil that has not been affected by leakage from the treatment zone; and (2) Indicate the quality of soil-pore liquid and the chemical make-up of the soil below the treatment zone. (c) The owner or operator shall establish a background value for each hazardous constituent to be monitored under Subsection R315-264-278(a). The permit shall specify the background values for each constituent or specify the procedures to be used to calculate the background values. (1) Background soil values may be based on a one-time sampling at a background plot having characteristics similar to those of the treatment zone. (2) Background soil-pore liquid values shall be based on at least quarterly sampling for one year at a background plot having characteristics similar to those of the treatment zone. (3) The owner or operator shall express all background values in a form necessary for the determination of statistically significant increases under Subsection R315-264-278(f). (4) In taking samples used in the determination of all background values, the owner or operator shall use an unsaturated zone monitoring system that complies with Subsection R315-264-278(b)(1). (d) The owner or operator shall conduct soil monitoring and soil-pore liquid monitoring immediately below the treatment zone. The Director shall specify the frequency and timing of soil and soil-pore liquid monitoring in the facility permit after considering the frequency, timing, and rate of waste application, and the soil permeability. The owner or operator shall express the results of soil and soil-pore liquid monitoring in a form necessary for the determination of statistically significant increases under Subsection R315-264-278(f). (e) The owner or operator shall use consistent sampling and analysis procedures that are designed to ensure sampling results that provide a reliable indication of soil-pore liquid quality and the chemical make-up of the soil below the treatment zone. At a minimum, the owner or operator shall implement procedures and techniques for: (2) Sample preservation and shipment; (3) Analytical procedures; and (4) Chain of custody control. (f) The owner or operator shall determine whether there is a statistically significant change over background values for any hazardous constituent to be monitored under Subsection R315-264-278(a) below the treatment zone each time he conducts soil monitoring and soil-pore liquid monitoring under Subsection R315-264-278(d). (1) In determining whether a statistically significant increase has occurred, the owner or operator shall compare the value of each constituent, as determined under Subsection R315-264-278(d), to the background value for that constituent according to the statistical procedure specified in the facility permit under Subsection R315-264-278(e). (2) The owner or operator shall determine whether there has been a statistically significant increase below the treatment zone within a reasonable time period after completion of sampling. The Director shall specify that time period in the facility permit after considering the complexity of the statistical test and the availability of laboratory facilities to perform the analysis of soil and soil-pore liquid samples. (3) The owner or operator shall determine whether there is a statistically significant increase below the treatment zone using a statistical procedure that provides reasonable confidence that migration from the treatment zone will be identified. The Director shall specify a statistical procedure in the facility permit that he finds: (i) Is appropriate for the distribution of the data used to establish background values; and (ii) Provides a reasonable balance between the probability of falsely identifying migration from the treatment zone and the probability of failing to identify real migration from the treatment zone. (g) If the owner or operator determines, pursuant to Subsection R315-264-278(f), that there is a statistically significant increase of hazardous constituents below the treatment zone, he shall: (1) Notify the Director of this finding in writing within seven days. The notification shall indicate what constituents have shown statistically significant increases. (2) Within 90 days, submit to the Director an application for a permit modification to modify the operating practices at the facility in order to maximize the success of degradation, transformation, or immobilization processes in the treatment zone. (h) If the owner or operator determines, pursuant to Subsection R315-264-278(f), that there is a statistically significant increase of hazardous constituents below the treatment zone, he may demonstrate that a source other than regulated units caused the increase or that the increase resulted from an error in sampling, analysis, or evaluation. While the owner or operator may make a demonstration under Subsection R315-264-278(h) in addition to, or in lieu of, submitting a permit modification application under Subsection R315-264-278(g)(2), he is not relieved of the requirement to submit a permit modification application within the time specified in Subsection R315-264-278(g)(2) unless the demonstration made under Subsection R315-264-278(h) successfully shows that a source other than regulated units caused the increase or that the increase resulted from an error in sampling, analysis, or evaluation. In making a demonstration under Subsection R315-264-278(h), the owner or operator shall: (1) Notify the Director in writing within seven days of determining a statistically significant increase below the treatment zone that he intends to make a determination under Subsection R315-264-278(h); (2) Within 90 days, submit a report to the Director demonstrating that a source other than the regulated units caused the increase or that the increase resulted from error in sampling, analysis, or evaluation; (3) Within 90 days, submit to the Director an application for a permit modification to make any appropriate changes to the unsaturated zone monitoring program at the facility; and (4) Continue to monitor in accordance with the unsaturated zone monitoring program established under Section R315-264-278. Utah Admin. Code R315-264-278
Adopted by Utah State Bulletin Number 2016-9, effective 4/15/2016