Current through Bulletin No. 2024-21, November 1, 2024
Section R315-264-1060 - Standards: Closed-Vent Systems and Control Devices(a) Owners and operators of closed-vent systems and control devices subject to Sections R315-264-1050 through 1065 shall comply with the provisions of Section R315-264-1033. (b)(1) The owner or operator of an existing facility who cannot install a closed-vent system and control device to comply with the provisions of Sections R315-264-1050 through 1065 on the effective date that the facility becomes subject to the provisions of Sections R315-264-1050 through 1065 shall prepare an implementation schedule that includes dates by which the closed-vent system and control device will be installed and in operation. The controls shall be installed as soon as possible, but the implementation schedule may allow up to 30 months after the effective date that the facility becomes subject to Sections R315-264-1050 through 1065 for installation and startup. (2) Any unit that begins operation after December 21, 1990, and is subject to the provisions of Sections R315-264-1050 through 1065 when operation begins, shall comply with the rules immediately, i.e., shall have control devices installed and operating on startup of the affected unit; the 30-month implementation schedule does not apply. (3) The owner or operator of any facility in existence on the effective date of a statutory or regulatory amendment that renders the facility subject to Sections R315-264-1050 through 1065 shall comply with all requirements of Sections R315-264-1050 through 1065 as soon as practicable but no later than 30 months after the amendment's effective date. When control equipment required by Sections R315-264-1050 through 1065 cannot be installed and begin operation by the effective date of the amendment, the facility owner or operator shall prepare an implementation schedule that includes the following information: Specific calendar dates for award or contracts or issuance of purchase orders for the control equipment, initiation of on-site installation of the control equipment, completion of the control equipment installation, and performance of any testing to demonstrate that the installed equipment meets the applicable standards of Sections R315-264-1050 through 1065. The owner or operator shall enter the implementation schedule in the operating record or in a permanent, readily available file located at the facility. (4) Owners and operators of facilities and units that become newly subject to the requirements of Sections R315-264-1050 through 1065 after December 8, 1997, due to an action other than those described in Subsection R315-264-1060(b)(3) shall comply with all applicable requirements immediately, i.e., shall have control devices installed and operating on the date the facility or unit becomes subject to Sections R315-264-1050 through 1065; the 30-month implementation schedule does not apply. Utah Admin. Code R315-264-1060
Adopted by Utah State Bulletin Number 2016-9, effective 4/15/2016