Utah Admin. Code 307-801-9

Current through Bulletin 2024-23, December 1, 2024
Section R307-801-9 - Asbestos Abatement, Renovation, and Demolition Projects: Requirement to Inspect
(1) Applicability. Contractors are required to have an asbestos inspection performed by a Utah certified asbestos inspector working for a Utah certified asbestos company. The asbestos inspection report shall be on-site and available when regulated work activities are being performed. Owners of residential structures including condominium owners of four units or less, not otherwise subject to the Asbestos NESHAP, are not required to perform asbestos inspections. Owners of a condominium complex of more than four units are subject to R307-801, may also be subject to the Asbestos NESHAP, but are required to perform asbestos inspections.
(2) Except as described in R307-801-9(1) and 9(3), the owner and operator shall ensure that the regulated facility to be demolished, abated, or renovated is thoroughly inspected for asbestos-containing material by an inspector certified under the provisions of R307-801-6. An asbestos inspection report shall be generated according to the provisions of R307-801-10 and completed prior to the start of the asbestos abatement, renovation, or demolition project if materials required to be identified in R307-801-10(3) will be disturbed during that project. The operator shall make the asbestos inspection report available on-site to all persons who have access to the site for the duration of the renovation, abatement, or demolition project, and to the director or authorized representative upon request.
(3) If the regulated facility has been ordered to be demolished because it is found by a government official to be structurally unsound and in danger of imminent collapse or a public health hazard, the operator may demolish the regulated facility without having the regulated facility inspected for asbestos. If no asbestos inspection is conducted, the operator shall:
(a) Ensure that all resulting demolition project debris is disposed of as asbestos-containing waste material (ACWM) according to R307-801-14; or
(b) reduce the amount of ACWM by segregating the ACWM from non-ACWM debris under the direction of an asbestos inspector certified according to R307-801-6 working for a company certified according to R307-801-5 and clean and encapsulate non-porous debris as non-ACWM by asbestos abatement supervisors or asbestos abatement workers who are certified according to R307-801-6 and working for a company certified according to R307-801-5.
(4) If an asbestos inspection report older than three years will be used for a regulated asbestos renovation, abatement, or demolition activity, the asbestos inspection report shall be reviewed and updated, as necessary, by an inspector who is certified according to R307-801-6 and working for a company certified according to R307-801-5. The report does not need to be reviewed until a time that it will be used for regulatory purposes such as an abatement, renovation, or demolition activity. If the inspection report is still accurate, then the inspector shall provide written documentation stating that the inspection report is still accurate. If the inspection report is not accurate, then the inspector shall provide written documentation, including new sample results, if necessary, such that the inspection report meets all requirements of R307-801.

Utah Admin. Code R307-801-9

Amended by Utah State Bulletin Number 2016-11, effective 5/5/2016