Current through Bulletin 2024-23, December 1, 2024
Section R307-415-5c - Permit Applications: Standard RequirementsInformation as described below for each emissions unit at a Part 70 source shall be included in the application except for insignificant activities and emissions levels under R307-415-5 e. The operating permit application shall include the elements specified below:
(1) Identifying information, including company name, company address, plant name and address if different from the company name and address, owner's name and agent, and telephone number and names of plant site manager or contact.(2) A description of the source's processes and products by Standard Industrial Classification Code, including any associated with each alternate scenario identified by the source.(3) The following emissions-related information: (a) A permit application shall describe the potential to emit of all air pollutants for which the source is major, and the potential to emit of all regulated air pollutants and hazardous air pollutants from any emissions unit, except for insignificant activities and emissions under R307-415-5e. For emissions of hazardous air pollutants under 1,000 pounds per year, the following ranges may be used in the application: 1-10 pounds per year, 11-499 pounds per year, 500-999 pounds per year. The mid-point of the range shall be used to calculate the emission fee under R307-415-9 for hazardous air pollutants reported as a range.(b) Identification and description of all points of emissions described in (a) above in sufficient detail to establish the basis for fees and applicability of applicable requirements.(c) Emissions rates in tons per year and in such terms as are necessary to establish compliance with applicable requirements consistent with the applicable standard reference test method.(d) The following information to the extent it is needed to determine or regulate emissions: fuels, fuel use, raw materials, production rates, and operating schedules.(e) Identification and description of air pollution control equipment and compliance monitoring devices or activities.(f) Limitations on source operation affecting emissions or any work practice standards, where applicable, for all regulated air pollutants and hazardous air pollutants at the Part 70 source.(g) Other information required by any applicable requirement, including information related to stack height limitations developed pursuant to Section 123 of the Act.(h) Calculations on which the information in items (a) through (g) above is based.(4) The following air pollution control requirements: (a) Citation and description of all applicable requirements, and(b) Description of or reference to any applicable test method for determining compliance with each applicable requirement.(5) Other specific information that may be necessary to implement and enforce applicable requirements or to determine the applicability of such requirements.(6) An explanation of any proposed exemptions from otherwise applicable requirements.(7) Additional information as determined to be necessary by the director to define alternative operating scenarios identified by the source pursuant to R307-415-6 a(9) or to define permit terms and conditions implementing emission trading under R307-415-7 d(1)(c) or R307-415-6 a(10).(8) A compliance plan for all Part 70 sources that contains all of the following: (a) A description of the compliance status of the source with respect to all applicable requirements.(b) A description as follows: (i) For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with such requirements.(ii) For applicable requirements that will become effective during the permit term, a statement that the source will meet such requirements on a timely basis.(iii) For requirements for which the source is not in compliance at the time of permit issuance, a narrative description of how the source will achieve compliance with such requirements.(c) A compliance schedule as follows: (i) For applicable requirements with which the source is in compliance, a statement that the source will continue to comply with such requirements.(ii) For applicable requirements that will become effective during the permit term, a statement that the source will meet such requirements on a timely basis. A statement that the source will meet in a timely manner applicable requirements that become effective during the permit term shall satisfy this provision, unless a more detailed schedule is expressly required by the applicable requirement.(iii) A schedule of compliance for sources that are not in compliance with all applicable requirements at the time of permit issuance. Such a schedule shall include a schedule of remedial measures, including an enforceable sequence of actions with milestones, leading to compliance with any applicable requirements for which the source will be in noncompliance at the time of permit issuance. This compliance schedule shall resemble and be at least as stringent as that contained in any judicial consent decree or administrative order to which the source is subject. Any such schedule of compliance shall be supplemental to, and shall not sanction noncompliance with, the applicable requirements on which it is based.(d) A schedule for submission of certified progress reports every six months, or more frequently if specified by the underlying applicable requirement or by the director, for sources required to have a schedule of compliance to remedy a violation.(e) The compliance plan content requirements specified in this paragraph shall apply and be included in the acid rain portion of a compliance plan for a Title IV affected source, except as specifically superseded by regulations promulgated under Title IV of the Act, Acid Deposition Control, with regard to the schedule and methods the source will use to achieve compliance with the acid rain emissions limitations.(9) Requirements for compliance certification, including all of the following: (a) A certification of compliance with all applicable requirements by a responsible official consistent with R307-415-5 d and Section 114(a)(3) of the Act, Enhanced Monitoring and Compliance Certification.(b) A statement of methods used for determining compliance, including a description of monitoring, recordkeeping, and reporting requirements and test method.(c) A schedule for submission of compliance certifications during the permit term, to be submitted annually, or more frequently if specified by the underlying applicable requirement or by the director.(d) A statement indicating the source's compliance status with any applicable enhanced monitoring and compliance certification requirements of the Act.(10) Nationally-standardized forms for acid rain portions of permit applications and compliance plans, as required by regulations promulgated under Title IV of the Act, Acid Deposition Control.Utah Admin. Code R307-415-5c