Current through Bulletin 2024-23, December 1, 2024
Section R307-221-3 - Emission Restrictions(1) The requirements found in 40 CFR 60.752 through 60.759, including Appendix A, effective as of date referenced in R307-101-3, are adopted and incorporated by reference, with the following exceptions and the substitutions listed in R307-221-3(2) through (5): (a) Substitute "director" for all federal regulation references to "Administrator."(b) Substitute "State of Utah" for all federal regulation references to "State, local or Tribal agency."(c) Substitute "R307-221" for all references to "This subpart" or "this part."(d) Substitute "40 CFR" for all references to "This title."(e) Substitute "Title 19, Chapter 6" for all references to "RCRA" or the "Resource Conservation and Recovery Act,"42 U.S.C. 6921, et seq.(f) Substitute "Rules R315-301 through 320" for all references to 40 CFR 258.(2) Instead of 40 CFR 60.757(a)(1),substitute the following: The initial design capacity report must be submitted within 90 days after the date on which EPA approves the state plan incorporated by reference under R307-220-2.(3) Instead of 40 CFR 60.757(a)(3), substitute the following: An amended design capacity report shall be submitted to the director providing notification of any increase in the design capacity of the landfill, whether the increase results from an increase in the permitted area or depth of the landfill, a change in the operating procedures, or any other means which results in an increase in the maximum design capacity of the landfill. The amended design capacity report shall be submitted within 90 days of the earliest of the following events: (a) the issuance of an amended operating permit;(b) submittal of application for a solid waste permit under R315-310; or(c) the change in operating procedures which will result in an increase in design capacity.(4) Instead of 40 CFR 60.757(b)(1)(i), substitute the following: The initial emission rate report for nonmethane organic compounds must be submitted within 90 days after EPA approval of the state plan incorporated by reference under R307-220-2.(5) Instead of 40 CFR 60.752(b)(2)(ii)(B)(2), substitute the following: The liner shall be installed with liners on the bottom and all sides in all areas in which gas is to be collected, or as approved by the director. The liner shall meet the requirements of Subsection R315-303-3(3).Utah Admin. Code R307-221-3