Section R66-2-18 - Change in Operation Plans
(1) A cannabis processing facility shall submit a notice, on a form provided by the department, before making any changes to the facility's operating plan, including:
(a) ownership or financial backing of the facility;
(b) the facility's name;
(c) a change in location;
(d) any modification, remodeling, expansion, reduction or physical, non-cosmetic alteration of a facility;
(e) change to the number of production lines; or
(f) any information requested by the department that shall allow the department to determine if requirements will be met.
(2) A cannabis processing facility may not implement changes to the initial approved operation plan without board approval.
(3) The board shall approve of requested changes unless approval would lead to a violation of the applicable laws and rules of the state.
(4) The department shall specify the reason for the denial of approval for a change to the operation plan.
(5) Before the board's review of a cannabis production establishment license under Subsection 4-41a-201.1(7)(e), the cannabis production establishment shall provide the board with:
(a) blueprints that show that there will be physical separation between medical cannabis and industrial hemp produced in their facility, including demonstrating storage and packaging areas on separate sides of the same room; and
(b) any information requested by the board that shall allow the board to determine if the requirements of Section R68-28-5 will be met before the medical cannabis production establishment processes industrial hemp or industrial hemp products.

Utah Admin. Code R66-2-18

Adopted by Utah State Bulletin Number 2024-10, effective 5/13/2024