Utah Admin. Code 33-12-301b

Current through Bulletin 2025-01, January 1, 2025
Section R33-12-301b - Ordering From a Multiple Award Contract
(1)
(a) When buying a procurement item from a multiple award contract solicited through an invitation for bids, a procurement unit shall:
(i) obtain a minimum of two quotes for the procurement item if the contract was awarded based on the method described in Subsection R33-12-301(5)(a)(i) and place the order for the procurement item with the vendor or contractor with the lowest quoted price;
(ii) place the order for the procurement item with the lowest bidder on contract unless the lowest bidder cannot provide the needed procurement item, then the order may be placed with the second lowest bidder unless the second lowest bidder cannot provide the needed procurement item and on, in order, from lowest bidder to highest bidder as described in Subsection R33-12-301(5)(a)(ii);
(iii) place the order in accordance with instructions contained in the contract for the procurement item if the contract was awarded based on the method described in Subsection R33-12-301(5)(a)(iii);
(iv) place the order for the procurement item if the contract was awarded based on the method described in Subsection R33-12-301(5)(b); or
(v) place the order for the procurement item if the contract was awarded based on the method described in Subsection R33-12-301(5)(c);
(b) The requirement to obtain two or more quotes in Subsection (1)(a)(i) is waived when there is only one bidder award for the particular procurement item or only one bidder is awarded per geographical area.
(2) When buying a procurement item from a multiple award contract solicited through an RFP, a procurement unit may place orders with any vendor or contractor under contract based on which procurement item best meets the needs of the procurement unit. Contracts awarded through the RFP process are awarded based on best value as determined by cost and non-price criteria specified in the RFP. As a result, all vendors, contractors and procurement items under contract issued through an RFP have been determined to provide best value to procurement units buying from these contracts.
(3) A procurement unit may not use a multiple award contract to steer purchases to a favored vendor or use any other means or methods that do not result in fair consideration being given to all vendors that have been awarded a contract under a multiple award.

Utah Admin. Code R33-12-301b

Adopted by Utah State Bulletin Number 2015-4, effective 1/28/2015
Amended by Utah State Bulletin Number 2017-14, effective 6/21/2017
Amended by Utah State Bulletin Number 2022-11, effective 5/23/2022