Current through Bulletin No. 2024-21, November 1, 2024
(1) To the extent appropriated by the Legislature, value engineering will be applied to achieve cost effective design solutions and informed decision-making by the division, for the following activities: TABLE |
PROGRAMMING |
1. Site Selection | as feasible |
2. Existing Facilities | Over 30,000 GSF |
3. Energy Conservation | Always |
4. New Facilities | Over 30,000 GSF |
DESIGN FOR CONSTRUCTION |
1. New Construction | Over 30,000 GSF |
2. Renovation | Over 30,000 GSF |
3. Energy Conservation | Always |
(2) Only facilities which fall below these area requirements will be automatically exempted. Other projects may be subjected to life cycle cost analysis at the discretion of the director.Amended by Utah State Bulletin Number 2023-04, effective 2/8/2023