Utah Admin. Code 23-5-10

Current through Bulletin No. 2024-21, November 1, 2024
Section R23-5-10 - Reporting Requirements
(1) The five-year building plan published annually by the director shall include a summary report on the statewide contingency reserve and the project reserve. This report shall include information on each reserve summarized as follows for the most recently completed fiscal year:
(a) beginning balance;
(b) increases and decreases by type; and
(c) ending balance.
(2) At least annually, the division shall analyze the balance in each reserve and the projected needs based on already approved projects and determine if the balance is more than or less than the projected need. The results of this analysis shall be reported to the Legislature in its regular session.
(3) The division shall report regularly to the executive director of the Department of Government Operations on the status of the statewide contingency reserve and the project reserve.

Utah Admin. Code R23-5-10

Amended by Utah State Bulletin Number 2018-4, effective 1/23/2018
Amended by Utah State Bulletin Number 2023-04, effective 2/8/2023