Current through Reg. 49, No. 49; December 6, 2024
Section 11.405 - Allowable Costs(a) Costs are allowable only if they are necessary expenditures for an activity for which TA Set-Aside Program funds may be used under § 11.404 of this subchapter (relating to Eligible Activities) and are eligible for reimbursement under applicable statutes and regulations.(b) Costs incurred before the execution of the local agreement or before federal and state approval and authorization to proceed are not eligible for reimbursement.(c) The costs of preliminary engineering, including environmental studies and documentation, design, and plans, specifications, and estimates are allowable costs.(d) The costs of right-of-way acquisition incidental to construction activities, as specified in the program call materials or otherwise approved by the department, are allowable costs.(e) Eligible pre-construction costs incurred by the department are reimbursable.(f) All pre-construction costs are the responsibility of the project sponsor except as provided by this section.(g) Expenditures for routine operation and maintenance are not allowable costs unless specifically allowed under the individual federal category for which the project qualifies.43 Tex. Admin. Code § 11.405
Adopted by Texas Register, Volume 41, Number 53, December 30, 2016, TexReg 10664, eff. 1/4/2017; Amended by Texas Register, Volume 45, Number 52, December 25, 2020, TexReg 9576, eff. 12/30/2020; Amended by Texas Register, Volume 47, Number 45, November 11, 2022, TexReg 7561, eff. 11/16/2022