Current through Reg. 49, No. 45; November 8, 2024
Section 351.54 - Preparation of Plans and Contractual InstrumentsThe authority, subject to the availability of funds, shall proceed as expeditiously as possible with the following:
(1) the preparation of plans and specifications for the regional wastewater treatment plant facilities and the submission of this data to the executive director;(2) the preparation of contractual instruments necessary to implement the regional system and the initiation of a program designed to bring about the execution of these contractual documents.30 Tex. Admin. Code § 351.54
The provisions of this §351.54 adopted to be effective February 24, 1978, 3 TexReg 595.