If an existing well is to be converted to an injection well, monitoring well, or production well, the commission may require the applicant to provide a geophysical log or a drilling log of the existing well.
30 Tex. Admin. Code § 331.225
If an existing well is to be converted to an injection well, monitoring well, or production well, the commission may require the applicant to provide a geophysical log or a drilling log of the existing well.
30 Tex. Admin. Code § 331.225