30 Tex. Admin. Code § 299.24

Current through Reg. 49, No. 44; November 1, 2024
Section 299.24 - Construction Progress Reports
(a) The owner shall have a professional engineer provide the following information to the executive director in writing within ten working days after construction on the dam commences:
(1) the actual start date;
(2) the contractor's name and address; and
(3) the name and telephone number of the professional engineer or inspector that will be on site during construction.
(b) The owner shall have a professional engineer submit monthly reports of progress on high- and significant-hazard dams to the executive director during construction. The report must include:
(1) the work accomplished during the month;
(2) the percent of the contract time used;
(3) the percentage of completion of the project on the date of the report;
(4) a description of problem areas encountered during construction;
(5) the dates of the reporting period; and
(6) any changes in the contact information.

30 Tex. Admin. Code § 299.24

The provisions of this §299.24 adopted to be effective January 1, 2009, 33 TexReg 10465