Current through Reg. 49, No. 49; December 6, 2024
Section 213.5 - Required Edwards Aquifer Protection Plans, Notification, and Exemptions(a) Required plans. A plan must be submitted for the following, as appropriate: (1) a water pollution abatement plan under subsection (b) of this section to conduct regulated activities on the recharge zone not covered by subsections (c), (d), or (e) of this section;(2) an organized sewage collection system plan under subsection (c) of this section for rehabilitation or construction related to existing or new organized sewage collection systems on the recharge zone;(3) an underground storage tank facility plan for static hydrocarbon and hazardous substance storage under subsection (d) of this section for the construction or rehabilitation of an underground storage tank system; including tanks, piping, and related systems located on the recharge zone or transition zone; and(4) an aboveground storage tank facility plan for static hydrocarbon and hazardous substance storage under subsection (e) of this section for the construction or rehabilitation of an aboveground storage tank system; including tanks, piping, and related systems, for the storage of hydrocarbon or hazardous substance located on the recharge zone or transition zone.(b) Water pollution abatement plan. A water pollution abatement plan must contain the following information.(1) Application. The information required under § 213.4 of this title (relating to Application Processing and Approval) is part of the plan and must be filed with the executive director at the appropriate regional office.(2) Site location. (A) Location data and maps must include a legible road map with directions, including mileage, which would enable the executive director to locate the site for inspection.(B) A general location map must include: (i) the site location on a copy (or spliced composite of copies, if necessary) of an official recharge zone map(s) with quadrangle name(s) and recharge and transition zone boundaries clearly labeled; and(ii) a drainage plan, shown on the recharge zone map, indicating all paths of drainage from the site.(C) A site plan with a minimum scale of one inch to 400 feet must show: (i) the 100-year floodplain boundaries (if applicable);(ii) the layout of the development showing existing and finished contours as appropriate, but not greater than ten-foot contour intervals;(iii) the location of all known wells (including, but not limited to, water wells, oil wells, and unplugged and abandoned wells);(iv) the location of any sensitive feature on the site of the proposed regulated activity as identified in the geologic assessment under paragraph (3) of this subsection;(v) the drainage patterns and approximate slopes anticipated after major grading activities;(vi) areas of soil disturbance and areas which will not be disturbed;(vii) locations of major structural and nonstructural controls identified in the technical report;(viii) locations where stabilization practices are expected to occur;(ix) surface waters (including wetlands); and(x) locations where stormwater discharges to a surface water or a sensitive feature.(3) Geologic assessment. For all regulated activities, the applicant must submit a geologic assessment report prepared by a geologist describing the site-specific geology. The report must identify all potential pathways for contaminant movement to the Edwards Aquifer. Single-family residential subdivisions constructed on less than ten acres are exempt from this requirement. The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report. (A) The geologic assessment must include a geologic map, at site-plan scale, illustrating: (i) the outcrop of surface geologic units; and(ii) all geologic and manmade features, specifically identifying:(IV) permeable fractures;(VI) surface streams; and(VII) other sensitive features.(B) The geologic assessment must contain a stratigraphic column showing, at a minimum, formations, members, and thicknesses.(C) The geologic assessment must contain a description and evaluation of all geologic and manmade features, on forms provided by, or approved by, the executive director. The assessment must determine which of these features are sensitive features. The assessment must include:(i) the identification of each geologic or manmade feature, with a cross-reference to the site-plan map coordinates; and(ii) the type of geologic or manmade feature including, but not limited to: (VI) potentially permeable fractures and solution zones.(D) The geologic assessment must contain a narrative assessment of site-specific geology. The assessment must detail the potential for fluid movement to the Edwards Aquifer and include a discussion of the stratigraphy, structure, and karstic characteristics of the site.(E) The geologic assessment must contain a narrative description of soil units and a soil profile, including thickness and hydrologic characteristics.(4) Technical report. (A) The technical report must address the following issues.(i) The report must describe the nature of the regulated activity (such as residential, commercial, industrial, or utility), including:(I) the size of the site in acres;(II) the projected population for the site;(III) the amount and type of impervious cover expected after construction is complete, such as paved surface or roofing;(IV) the amount of surface expected to be occupied by parking lots; and(V) other factors that could affect surface water and groundwater quality.(ii) The report must describe the volume and character of wastewater expected to be produced. Wastewater generated at a site should be characterized as either domestic or industrial, or if commingled, by approximate percentages of each type.(iii) The report must describe the volume and character of stormwater runoff expected to occur. Estimates of stormwater runoff quality and quantity should be based on area and type of impervious cover, as described in clause (i) of this subparagraph. An estimate of the runoff coefficient of the site for both the pre-construction and post-construction conditions should be included in the report.(iv) The report must describe any activities or processes which may be a potential source of contamination.(v) The report must describe the intended sequence of major activities which disturb soils for major portions of the site (e.g., grubbing, excavation, grading, utilities and infrastructure installation).(vi) The report must contain estimates of the total area of the site that is expected to be disturbed by excavation, grading, or other activities.(vii) The report must contain the name of the receiving water(s) at or near the site which will be disturbed or which will receive discharges from disturbed areas of the project.(B) The technical report must describe the temporary best management practices (BMPs) and measures that will be used during and after construction. The technical report must clearly describe for each major activity identified in subparagraph (A)(v) of this paragraph appropriate control measures and the general timing (or sequence) during the construction process that the measures will be implemented. (i) BMPs and measures must prevent pollution of surface water, groundwater, or storm water that originates upgradient from the site and flows across the site as provided under this paragraph.(ii) BMPs and measures must prevent pollution of surface water or groundwater that originates on-site or flows off site, including pollution caused by contaminated stormwater runoff from the site as provided under this paragraph.(iii) BMPs and measures must prevent pollutants from entering surface streams, sensitive features, or the aquifer as provided under this paragraph.(iv) To the maximum extent practicable, BMPs and measures must maintain flow to naturally- occurring sensitive features identified in either the geologic assessment, executive director review, or during excavation, blasting, or construction.(I) The temporary sealing of a naturally-occurring sensitive feature which accepts recharge to the Edwards Aquifer as a temporary pollution abatement measure during active construction should be avoided.(II) A request to temporarily seal must include a justification as to why no reasonable and practicable alternative exists. The request will be evaluated by the executive director on a case-by-case basis.(v) Temporary BMPs and measures must meet the requirements contained in subparagraph (D)(i) of this paragraph.(vi) The report must include a plan for the inspection of temporary BMPs and measures and for their timely maintenance, repair, and, if necessary, retrofit.(vii) Temporary sediment pond or basin construction plans and design calculations for a proposed temporary BMP or measure must be prepared by or under the direct supervision of a Texas licensed professional engineer. All construction plans and design information must be signed, sealed, and dated by the Texas licensed professional engineer.(viii) Pilot-scale field testing (including water quality monitoring) may be required for BMPs that are not contained in technical guidance recognized by, or prepared by, the executive director.(ix) The construction-phase BMPs for erosion and sediment controls should be designed to retain sediment on site to the extent practicable.(x) All control measures must be properly selected, installed, and maintained in accordance with the manufacturers specifications and good engineering practices. If periodic inspections by the applicant or the executive director, or other information indicates a control has been used inappropriately, or incorrectly, the applicant must replace or modify the control for site situations.(xi) If sediment escapes the construction site, off-site accumulations of sediment must be removed at a frequency sufficient to minimize off-site impacts to water quality (e.g., fugitive sediment in street being washed into surface streams or sensitive features by the next rain).(xii) Sediment must be removed from sediment traps or sedimentation ponds not later than when design capacity has been reduced by 50%.(xiii) Litter, construction debris, and construction chemicals exposed to storm water shall be prevented from becoming a pollutant source for storm water discharges (e.g., screening outfalls, picked up daily).(C) The technical report must describe the permanent BMPs and measures that will be used during and after construction is completed. (i) BMPs and measures must prevent pollution of surface water, groundwater, or storm water that originates upgradient from the site and flows across the site.(ii) BMPs and measures must prevent pollution of surface water or groundwater that originates on-site or flows off the site, including pollution caused by contaminated storm water runoff from the site.(iii) BMPs and measures must prevent pollutants from entering surface streams, sensitive features, or the aquifer.(iv) To the extent practicable, BMPs and measures must maintain flow to naturally occurring sensitive features identified in either the geologic assessment, executive director review, or during excavation, blasting, or construction. (I) The permanent sealing of, or diversion of, flow from a naturally occurring sensitive feature that accepts recharge to the Edwards Aquifer as a permanent pollution abatement measure should be avoided.(II) A request to seal a naturally occurring sensitive feature must include a justification as to why no reasonable and practicable alternative exists. The request will be evaluated by the executive director on a case-by-case basis.(v) Permanent BMPs and measures must meet the requirements contained in subparagraph (D)(ii) of this paragraph.(vi) Construction plans and design calculations for the proposed permanent BMPs and measures must be prepared by, or under the direct supervision of, a Texas licensed professional engineer. All construction plans and design information must be signed, sealed, and dated by the Texas licensed professional engineer.(vii) The technical report must include a plan for the inspection of the permanent BMPs and measures and for their timely inspection, maintenance, repair, and, if necessary, retrofit. The plan must be prepared and certified by the engineer designing the permanent BMPs and measures. The plan must be signed by the owner or responsible party.(viii) Pilot-scale field testing (including water quality monitoring) may be required for BMPs that are not contained in technical guidance recognized by, or prepared by, the executive director. (I) When pilot-scale field testing of an innovative technology (including water quality monitoring) is required, only one pilot site will be approved.(II) No additional approvals will be granted until the pilot study is complete and the applicant demonstrates adequate protection of the Edwards Aquifer.(III) If the innovative technology demonstrates adequate protection of the Edwards Aquifer, additional units may be approved for use as permanent pollution abatement measures on the Edwards Aquifer recharge zone.(IV) If the innovative technology demonstrates inadequate protection of the Edwards Aquifer, a retrofit of the pollution abatement measure may be required to achieve compliance with requirements under subparagraph (D) of this paragraph and no additional units will be approved for use on the Edwards Aquifer recharge zone.(D) Requirements for BMPs and measures. (i) Temporary BMPs. (I) The technical report must include a description of interim and permanent stabilization practices for the site, including a schedule of when the practices will be implemented. Stabilization practices may include, but are not limited to: establishment of temporary vegetation, establishment of permanent vegetation, mulching, geotextiles, sod stabilization, vegetative buffer strips, protection of trees, preservation of mature vegetation, and other appropriate measures. (-a-) The following records shall be maintained and made available to the executive director upon request: the dates when major grading activities occur; the dates when construction activities temporarily or permanently cease on a portion of the site; and the dates when stabilization measures are initiated.(-b-) Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than 14 days after the construction activity in that portion of the site has temporarily or permanently ceased. Where the initiation of stabilization measures by the 14th day after construction activity temporary or permanently cease is precluded by weather conditions, stabilization measures shall be initiated as soon as practicable. Where construction activity on a portion of the site is temporarily ceased, and earth disturbing activities will be resumed within 21 days, temporary stabilization measures do not have to be initiated on that portion of site. In areas experiencing droughts where the initiation of stabilization measures by the 14th day after construction activity has temporarily or permanently ceased is precluded by seasonal arid conditions, stabilization measures shall be initiated as soon as practicable.(II) The technical report must include a description of structural practices to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from exposed areas of the site to the degree attainable. Structural practices may include, but are not limited to: silt fences, earth dikes, drainage swales, sediment traps, checks dams, subsurface drains, pipe slope drains, level spreaders, storm drain inlet protection, rock outlet protection, reinforced soil retaining systems, gabions, and sediment basins. Placement of structural practices in floodplains should be avoided to the degree attainable. (-a-) For common drainage locations that serve an area with ten or more acres disturbed at one time, a sediment basin that provides storage for a calculated volume of runoff from a two-year, 24-hour storm from each disturbed acre drained, or equivalent control measures, shall be provided where attainable until final stabilization of the site. Where no such calculation has been performed, a sediment basin providing 3,600 cubic feet of storage per acre drained, or equivalent control measures, shall be provided where attainable until final stabilization of the site. When computing the number of acres draining into a common location it is not necessary to include flows from off-site areas and flows from on-site areas that are either undisturbed or have undergone final stabilization where such flows are diverted around both the disturbed area and the sediment basin.(-b-) In determining whether installing a sediment basin is attainable, the applicant may consider factors such as site soils, slope, and available area on site. For drainage locations which serve ten or more disturbed acres at one time and where a sediment basin or equivalent controls is not attainable, smaller sediment basins and/or sediment traps should be used. Where neither the sediment basin nor equivalent controls are attainable due to site limitations, silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries of the construction area and for those side slope boundaries deemed appropriate as dictated by individual site conditions. The executive director encourages the use of a combination of sediment and erosion control measures in order to achieve maximum pollutant removal.(-c-) For drainage locations serving less than ten acres, smaller sediment basins and/or sediment traps should be used. At a minimum, silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries (and for those side slope boundaries deemed appropriate as dictated by individual site conditions) of the construction area unless a sediment basin providing storage for a calculated volume of runoff from a two-year, 24- hour storm or 3,600 cubic feet of storage per acre drained is provided. The executive director encourages the use of a combination of sediment and erosion control measures in order to achieve maximum pollutant removal.(ii) Permanent BMPs and measures. (I) BMPs and measures must be implemented to control the discharge of pollution from regulated activities after the completion of construction. These practices and measures must be designed, constructed, operated, and maintained to insure that 80% of the incremental increase in the annual mass loading of total suspended solids from the site caused by the regulated activity is removed. These quantities must be calculated in accordance with technical guidance prepared or accepted by the executive director.(II) Owners of permanent BMPs and measures must insure that the BMPs and measures are constructed and function as designed. A Texas licensed professional engineer must certify in writing that the permanent BMPs or measures were constructed as designed. The certification letter must be submitted to the appropriate regional office within 30 days of site completion.(III) Where a site is used for low density single-family residential development and has 20% or less impervious cover, other permanent BMPs are not required. This exemption from permanent BMPs must be recorded in the county deed records, with a notice that if the percent impervious cover increases above 20% or land use changes, the exemption for the whole site as described in the property boundaries required by § 213.4(g) of this title, may no longer apply and the property owner must notify the appropriate regional office of these changes.(IV) The executive director may waive the requirement for other permanent BMPs for multi-family residential developments, schools, or small business sites where 20% or less impervious cover is used at the site. This exemption from permanent BMPs must be recorded in the county deed records, with a notice that if the percent impervious cover increases above 20% or land use changes, the exemption for the whole site as described in the property boundaries required by § 213.4(g) of this title, may no longer apply and the property owner must notify the appropriate regional office of these changes.(E) The technical report must describe measures that will be used to avoid or minimize surface stream contamination and changes in the way in which water enters a stream as a result of the construction and development. The measures should address the following: (i) increased stream flashing;(ii) the creation of stronger flows and in-stream velocities; or(iii) other in-stream effects caused by the regulated activity which increase erosion that results in water quality degradation.(F) The technical report must describe the method of wastewater disposal from the site. (i) If wastewater is to be disposed of by conveyance to a sewage treatment plant for treatment and disposal, the existing or proposed treatment facility must be identified.(ii) If wastewater is to be disposed of by an on-site sewage facility, the application must include a written statement from the appropriate authorized agent, stating that the site is suitable for the use of private sewage facilities and will meet the special requirements for on-site sewage facilities located on the Edwards Aquifer recharge zone as specified under Chapter 285 of this title (relating to On-Site Sewage Facilities), or identifying those areas that are not suitable.(G) The technical report must describe the measures that will be used to contain any spill of hydrocarbons or hazardous substances such as on a roadway or from a pipeline or from temporary aboveground storage of 250 gallons or more. (i) Temporary storage facilities are those used on site for less than one year.(ii) Temporary aboveground storage tank systems of 250 gallons or more cumulative storage capacity must be located a minimum horizontal distance of 150 feet from any domestic, industrial, irrigation, or public water supply well, or other sensitive feature.(5) Responsibility for maintenance of permanent BMPs and measures after construction is complete. (A) The applicant shall be responsible for maintaining the permanent BMPs after construction until such time as the maintenance obligation is either assumed in writing by another entity having ownership or control of the property (such as without limitation, an owner's association, a new property owner or lessee, a district, or municipality) or the ownership of the property is transferred to the entity. Such entity shall then be responsible for maintenance until another entity assumes such obligations in writing or ownership is transferred.(B) A copy of the transfer of responsibility must be filed with the executive director at the appropriate regional office within 30 days of the transfer.(C) This paragraph applies to:(i) multiple single-family residential developments, multi-family residential; and(ii) non-residential developments such as commercial, industrial, institutional, schools, and other sites where regulated activities occur.(c) Organized sewage collection systems. (1) No person may commence rehabilitation or construction related to an existing or new organized sewage collection system on the recharge zone, until final design plans, specifications, and an engineering report, as specified in Chapter 317 of this title (relating to Design Criteria for Sewerage Systems) and appropriate special requirements of this section, have been filed with and approved by the executive director.(2) General design of sewage collection systems. Design of new sewage collection systems on the recharge zone must comply with Chapter 317 of this title.(3) Special requirements for sewage collection systems. In addition to the requirements in paragraph (2) of this subsection, sewage collection systems on the recharge zone must meet the following special requirements.(A) Manhole rehabilitation or construction. All manholes rehabilitated or constructed after March 21, 1990, must be watertight, with watertight rings and covers and must be constructed and tested to meet the requirements of § 317.2(c)(5)(H) of this title (relating to Sewage Collection System).(B) Piping for gravity and pressurized collection systems. Compliance with the following is required, unless local regulations dictate more stringent standards: (i) for gravity collection systems, all PVC pipe must have a Standard Dimension Ratio (SDR) of 35 or less and meet the requirements of §317.2(a) - (c)(4) of this title; and(ii) for all pressurized sewer systems, all PVC pipe must have a minimum working pressure rating of 150 pounds per square inch and meet the requirements of §317.2(d)(2) - (4) and §317.3(d)(5) - (7) of this title (relating to Sewage Collection System and Lift Stations).(C) Lift station design. Lift stations must be designed and constructed to ensure that bypassing of any sewage does not occur. All lift stations must be designed to meet the requirements of § 317.2(d) and § 317.3 of this title. A lift station application must include final construction plans and a design report prepared by or under the direct supervision of a Texas licensed professional engineer. All design information must be signed, sealed, and dated by a Texas licensed professional engineer.(D) Certification of new sewage collection system lines by a Texas licensed professional engineer. Owners of sewage collection systems must insure that all new gravity sewer system lines having a diameter greater than or equal to six inches and all new force mains are tested for leakage following construction. Such lines must be certified by a Texas licensed professional engineer to meet the appropriate requirements of § 317.2 of this title. The engineer must retain copies of all test results which must be made available to the executive director upon request. The engineer must certify in writing that all wastewater lines have passed all required testing to the appropriate regional office within 30 days of test completion and prior to use of the new collection system. Following the completion of the new sewer lines and manholes, they must be tested every five years thereafter in accordance with subparagraph (E) of this paragraph.(E) Testing of existing sewer lines. Owners of sewage collection systems must insure that all existing sewer lines having a diameter greater than or equal to six inches, including private service laterals, manholes, and connections, are tested to determine types and locations of structural damage and defects such as offsets, open joints, or cracked or crushed lines that would allow exfiltration to occur. Existing manholes and lift station wet wells must be tested using methods for new structures which are approved by the executive director. (i) Testing of all sewage collection systems must be conducted every five years after being put into use. Any sewage collection system in place as of March 21, 1990 must have commenced and completed the first round of five-year testing. Every five years, existing sewage collection systems must be tested to determine types and locations of structural damage and defects such as offsets, open joints, or cracked or crushed lines that would allow exfiltration to occur. These test results must be certified by a Texas licensed professional engineer. The test results must be retained by the plan holder for five years and made available to the executive director upon request. The use of one of the following methods will satisfy the requirements for the five-year testing of existing sewer lines. (I) In-place deflection testing must meet the requirements of § 317.2(a)(4)(C) of this title. No pipe shall exceed a deflection rate of 5.0%.(II) Internal line inspections, using a color television camera to verify that the lines are free of structural damage such as offsets, open joints, or cracked or crushed lines, that would allow exfiltration to occur, are acceptable. The use of black and white television equipment may be used following demonstration to the executive director that an acceptable inspection can be performed as provided in subclause (IV) of this clause.(III) In-line smoke testing is acceptable only for the testing of private service laterals.(IV) Testing methods other than those listed in this subsection must be approved by the executive director prior to initiating the sewer line testing.(ii) Except as otherwise provided in an enforcement order of the commission, as soon as possible, but at least within one year of detecting defects, repairs to the sewage collection system must be completed by the system's owner. However, all leakage must be immediately contained to prevent any discharge to water in the state or pollution of the Edwards Aquifer whether necessary repairs have been completed or not. Leakage is a violation of Texas Water Code, § 26.121 and these rules are not intended to excuse such unlawful discharge of waste into or adjacent to water in the state. All repairs must be certified by a Texas licensed professional engineer. Repairs must be tested within 45 days of completion using the methods described in clause (i) of this subparagraph. Results must be submitted to the appropriate regional office within 30 days of testing.(F) Blasting for sewer line excavation. Blasting for sewer line excavation must be done in accordance with appropriate criteria established by the National Fire Protection Association. Should such blasting result in damage to an existing or newly completed sewer line or any of its appurtenances, the owner of the sewer system and appurtenances must repair and retest the damaged sewer line and its appurtenances immediately. The use of sand for pipe embedment or backfill in blasted rock is prohibited.(G) Sewer line stub outs. New collection system lines must be constructed with stub outs for the connection of anticipated extensions. The location of such stub outs must be marked on the ground such that their location can be easily determined at the time of connection of the proposed extensions. All stub outs must be sealed with a manufactured cap to prevent leakage. Extensions that were not anticipated at the time of original construction or that are to be connected to an existing sewer line not furnished with stub outs must be connected using a manufactured saddle in accordance with accepted plumbing techniques.(i) Main line stub outs. Manholes must be placed at the end of all sewer lines that will be extended at a future date, as specified in § 317.2(c)(5) of this title. If the main line is to be extended within one year, a variance to allow the use of a stub out until the line is extended will be considered on a case-by-case basis. At the time of original construction, new stub outs must be constructed sufficiently to extend beyond the end of the street pavement. Stub outs that were not anticipated at the time of original construction must enter the manhole using a bored or drilled hole. Chiseling or hammering to enter a manhole is prohibited.(ii) Private service lateral stub outs. Such stub outs must be manufactured using wyes or tees that are compatible in size and material with both the sewer line and the extension. Private service lateral stub outs that were not anticipated at the time of original construction must be connected using a manufactured saddle in accordance with accepted plumbing techniques.(H) Locating sewer lines within a five-year floodplain. Sewer lines may not be located within the five-year floodplain of a drainageway, unless an exemption is granted by the executive director. If the applicant demonstrates to the executive director that such location is unavoidable, and the area is subject to inundation and stream velocities which could cause erosion and scouring of backfill, the trench must be capped with concrete to prevent scouring of backfill, or the sewer lines must be encased in concrete. All concrete must have a minimum thickness of six inches.(I) Inspection of private service lateral connections. After installing and prior to covering and connecting a private service lateral to an organized sewage collection system, a Texas licensed professional engineer, Texas registered sanitarian, or appropriate city inspector must inspect the private service lateral and the connection to the collection system and certify that construction conforms with the applicable provisions of this subsection and local plumbing codes. Private service laterals may only be connected to approved sewage collection systems.(J) Embedment materials. Embedment materials must meet the specification for bedding contained in § 317.2(a)(5) of this title.(K) Sewer lines bridging caverns or other sensitive features. Sewer lines that bridge caverns or sensitive features must be constructed in a manner that will maintain the structural integrity of the line. When such geologic features are encountered during construction, the location and extent of those features must be assessed by a geologist and must be reported to the appropriate regional office in writing within two working days of discovery. Notification and inspection must comply with the requirements under subsection (f) of this section.(L) Erosion and sedimentation control. A temporary erosion and sedimentation control plan must be included with all construction plans. All temporary erosion and sedimentation controls must be installed prior to construction, must be maintained during construction, and must be removed when sufficient vegetation is established to control the erosion and sedimentation and the construction area is stabilized.(M) Alternative sewage collection systems. The executive director may approve an alternative procedure which is technically justified; signed, sealed, and dated by a Texas licensed professional engineer indicating equivalent environmental protection; and which complies with the requirements of § 317.2(d) of this title.(N) Required corrective action. Notwithstanding compliance with the requirements of subparagraphs (A) - (M) of this paragraph, sewage collection systems must operate in a manner that will not cause pollution of the Edwards Aquifer. Any failure must be corrected in a manner satisfactory to the executive director.(4) Contents of organized sewage collection system plan. (A) Application. For organized sewage collection systems, the information required under § 213.4(a)(5) of this title must be filed with the executive director at the appropriate regional office.(B) Narrative description of proposed organized sewage collection system. A narrative report must include, at a minimum, a geographic description and anticipated type of development within the sewage collection system service area.(C) Geologic assessment. A geologic assessment, as described in subsection (b)(3) of this section, must be performed by a geologist along the path of the proposed sewer line(s), plus 50 feet on each side of the proposed sewer line(s). The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report.(D) Technical report. For an organized sewage collection system, a technical report must be submitted on forms provided by, or approved by, the executive director. The technical report must contain the information requested in the following subsections of this section: (b)(4)(A)(ii) and (iv), (B), (D)(i), (F)(i), and (G). A technical report for a water pollution abatement plan submitted under subsection (b) of this section satisfies this requirement, provided it properly addresses the proposed sewage collection system.(E) Plans and specifications. Plans and specifications addressing all the requirements in paragraphs (2) and (3) of this subsection, must include at a minimum: (i) a map showing the location of the organized sewage collection system layout in relation to recharge zone boundaries;(ii) a map showing the location of the organized sewage collection system layout overlaid by topographic contour lines, using a contour interval of not greater than ten feet, and showing the area within both the five-year floodplain and the 100-year floodplain of any drainage way;(iii) construction documents prepared by, or under the supervision of, a Texas licensed professional engineer, which have also been signed, sealed, and dated by that Texas licensed professional engineer, at a minimum, must include:(I) plan and profile views of the collection system;(II) construction details of collection system components;(III) specifications for all collection system components; and(IV) proposed pollution abatement measures for sensitive features identified along the path of the proposed sewer line.(d) Static hydrocarbon and hazardous substance storage in underground storage tanks system. (1) Standards for underground storage tank systems. New or replacement systems for the underground storage of static hydrocarbons or hazardous substances must be of double-walled or an equivalent method approved by the executive director. Methods for detecting leaks in the inside wall of a double-walled system must be included in the facility's design and construction. The leak detection system must provide continuous monitoring of the system and must be capable of immediately alerting the system's owner of possible leakages.(A) Installation. All underground hydrocarbon and hazardous substance storage tank systems must be installed by a person possessing a valid certificate of registration in accordance with the requirements of Chapter 334, Subchapter I of this title (relating to Underground Storage Tank On-Site Supervisor Licensing and Contractor Registration).(B) Siting. Any new underground hydrocarbon and hazardous substance storage tank system that does not incorporate a method for tertiary containment must be located a minimum horizontal distance of 150 feet from any domestic, industrial, or irrigation well, or other sensitive feature as determined under the geologic assessment at the time of construction or replacement under paragraph (2)(C) of this subsection or the tankhold inspection under subsection (f)(2)(B) of this section. This method of tertiary containment also applies to the placement of a tank system within 150 feet of a public water supply well without a sanitary control easement of 150 feet as defined in § 290.41(c)(1)(F) of this title (relating to Water Sources).(2) Contents of an underground storage tank facility plan. An underground storage tank facility plan must, at a minimum, contain the following information.(A) Application. The information required under § 213.4 of this title must be filed with the executive director at the appropriate regional office.(B) Site location map. A site location map as specified in subsection (b)(2) of this section including a legible road map, a general location map, and a site plan, must be submitted as part of the plan.(C) Geologic assessment. For all facilities located on either the recharge zone or transition zone, a geologic assessment prepared by a geologist, as described in subsection (b)(3) of this section, must be submitted for the site. The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report.(D) Technical report. For all facilities, located on either the recharge zone or transition zone, a technical report must be submitted on forms provided by, or approved by, the executive director. The technical report must contain the information requested in subsection (b)(4)(B) and (C) and (5) of this section. A technical report for a water pollution abatement plan submitted under subsection (b) of this section satisfies this requirement, provided it properly addresses the proposed underground storage tank facility.(e) Static hydrocarbon and hazardous substance storage in an aboveground storage tank facility. (1) Design standards. Systems used for the temporary and permanent aboveground storage of static hydrocarbon and hazardous substance must be constructed within controlled drainage areas that are sized to capture one and one-half (1-1/2) times the storage capacity of the system. The controlled drainage area must be constructed of, and in a material impervious to, the substance(s) being stored, and must direct spills to a convenient point for collections and recovery. Any spills from storage tank facilities must be removed from the controlled drainage area for disposal within 24 hours of the spill.(2) Contents of an aboveground storage tank facility plan. A permanent aboveground storage tank facility plan must contain, at a minimum, the following information.(A) Application. For an aboveground storage tank facility, the information required under § 213.4 of this title must be filed with the executive director at the appropriate regional office.(B) Site location map. A site location map as specified in subsection (b)(2) of this section, including a legible road map, a general location map, and a site plan, must be submitted as part of the plan for a permanent facility.(C) Geologic assessment. For all facilities located on either the recharge zone or transition zone, a geologic assessment prepared by a geologist, as described in subsection (b)(3) of this section, must be submitted for the area containing the aboveground storage tank system. The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report.(D) Technical report. For all facilities located on either the recharge zone or transition zone, a technical report must be submitted on forms provided by, or approved by, the executive director. The technical report must contain the information requested in subsection (b)(4)(B) and (C) and (5) of this section. A technical report for a water pollution abatement plan submitted under subsection (b) of this section satisfies this requirement, provided it properly addresses the proposed aboveground storage tank facility.(3) A description of measures that will be used to contain any spill of hydrocarbons or hazardous substances from temporary storage of 250 gallons or more must be included with the plan unless described under subsection (b)(4)(G) of this section. Any new temporary aboveground hydrocarbon and hazardous substance storage tank system must be located a minimum horizontal distance of 150 feet from any domestic, industrial, irrigation, or public water supply well, or other sensitive feature.(4) Exemptions from this section.(A) Equipment used to transmit electricity that utilizes oil for insulation or cooling purposes, including transformers and oil circuit breakers, are exempt from this subsection. Construction of supporting structures is a regulated activity for which a water pollution abatement plan under subsection (a)(1) of this section is required.(B) Permanent storage facilities with a cumulative storage capacity of less than 500 gallons are exempt from this section.(f) Notification and inspection. (1) The applicant must provide written notification of intent to commence construction, replacement, or rehabilitation. Notification must be given to the appropriate regional office no later than 48 hours prior to commencement of the regulated activity. (A) Written notification must include: (i) the date on which the regulated activity will commence;(ii) the name of the approved plan for the regulated activity; and(iii) the name of the prime contractor and the name and telephone number of the contact person.(B) The executive director will use the notification to determine if the applicant is eligible for an extension of an approved plan. Construction will not be considered to have commenced until written notification is received by the appropriate regional office.(2) If any sensitive feature is discovered during construction, replacement, or rehabilitation, all regulated activities near the sensitive feature must be suspended immediately. (A) The holder of an approved Edwards Aquifer protection plan must immediately notify the appropriate regional office of any sensitive features encountered during construction. This notice must be given before continuing construction.(B) Regulated activities near the sensitive feature may not proceed until the executive director has reviewed a geologic assessment report prepared by a geologist that consists of information required under subsection (b)(3)(C) and (D) of this section for the sensitive feature and has reviewed and approved the methods proposed to protect the sensitive feature and the Edwards Aquifer from potentially adverse impacts to water quality. The geologic assessment report must be signed, sealed, and dated by the geologist preparing the report.(C) The holder of an approved sewage collection system plan, must meet the following. (i) Upon completion of any lift station excavation, a geologist must certify that the excavation has been inspected for the presence of sensitive features. The certification must be signed, sealed, and dated by the geologist preparing the certification. Certification that the excavation has been inspected must be submitted to the appropriate regional office.(I) Further activities may not proceed until the executive director has reviewed and approved the methods proposed to protect any sensitive feature and the Edwards Aquifer from potentially adverse impacts to water quality from the lift station.(II) Construction may continue if the geologist certifies that no sensitive feature or features were present.(ii) The applicant must submit a plan for ensuring the structural integrity of the sewer line or for modifying the proposed collection system alignment around the feature. The plan must be certified by a Texas licensed professional engineer. These plans must be submitted to the appropriate regional office for review and approval.(D) For an approved underground storage tank facility plan, a geologist must certify that a completed tankhold excavation has been inspected for the presence of sensitive features. The certification must be signed, sealed, and dated by the geologist preparing the certification.(i) Certification that the tankhold excavation has been inspected must be submitted to the appropriate regional office.(ii) If a sensitive feature is discovered, the applicant must propose methods to protect the feature and the Edwards Aquifer from potentially adverse impacts to water quality from the underground storage tank system. Installation activities may not proceed until the executive director has reviewed and approved the proposed methods. The protection methods must be consistent with subsection (d)(1)(B) of this section.(iii) Construction may continue if the geologist certifies that no sensitive feature or features were present.(3) The executive director must review methods or plans proposed to protect sensitive features and the Edwards Aquifer from potentially adverse impacts to water quality. This review will be completed within one week of receiving a method or plan. Regulated activities near the sensitive feature may not continue until the executive director has approved the proposed methods or plans.(g) On-site sewerage systems. On-site sewerage systems located on the recharge zone are subject to § 285.40 of this title (relating to OSSFs on the Recharge Zone of the Edwards Aquifer) and other applicable provisions contained in Chapter 285 of this title. Systems must be designed, installed, maintained, repaired, and replaced in accordance with Chapter 285 of this title.(h) Exemption. (1) Regulated activities exempt from the Edwards Aquifer protection plan application requirements under this section are:(A) the installation of natural gas lines;(B) the installation of telephone lines;(C) the installation of electric lines;(D) the installation of water lines;(E) the installation of other utility lines which are not designed to carry and will not carry the following: (iii) sewage effluent; or(iv) treated effluent from a wastewater treatment facility.(2) An individual land owner who seeks to construct his/her own single-family residence or associated residential structures on the site is exempt from the Edwards Aquifer protection plan application requirements under this section, provided that he/she does not exceed 20% impervious cover on the site.(3) Temporary erosion and sedimentation controls are required to be installed and maintained for exempted activities on the recharge zone.(4) All temporary erosion and sedimentation controls: (A) must meet the requirements contained in subsection (b)(4)(D)(i) of this section;(B) must be installed prior to construction;(C) must be maintained during construction; and(D) may be removed only when vegetation is established and the construction area is stabilized.(5) The executive director may monitor storm water discharges from these projects to evaluate the adequacy of the temporary erosion and sedimentation control measures. Additional protection will be required if the executive director determines that these controls are inadequate to protect water quality.30 Tex. Admin. Code § 213.5
The provisions of this §213.5 adopted to be effective December 27, 1996, 21 TexReg 12125; amended to be effective June 1, 1999, 23 TexReg 10477; amended to be effective September 1, 2003, 28 TexReg 6291