Current through Reg. 49, No. 44; November 1, 2024
Section 117.1354 - Final Control Plan Procedures for Attainment Demonstration Emission Specifications(a) The owner or operator of utility boilers listed in § 117.1300 of this title (relating to Applicability) at a major source of nitrogen oxides (NOX) shall submit to the Office of Compliance and Enforcement, the appropriate regional office, and the Office of Air, a final control report to show compliance with the requirements of § 117.1310 of this title (relating to Emission Specifications for Eight-Hour Attainment Demonstration). The report must include: (1) the methods of NOX control for each utility boiler;(2) the emissions measured by testing required in § 117.1335 of this title (relating to Initial Demonstration of Compliance);(3) the submittal date, and whether sent to the central or the regional office (or both), of any compliance stack test report or monitor certification report required by § 117.1335 of this title that is not being submitted concurrently with the final compliance report; and(4) the specific rule citation for any utility boiler with a claimed exemption from the emission specification of § 117.1310 of this title.(b) The report must be submitted by the applicable date specified for final control plans in § 117.9130 of this title (relating to Compliance Schedule Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources).30 Tex. Admin. Code § 117.1354
The provisions of this §117.1354 adopted to be effective June 14, 2007, 32 TexReg 3206; Amended by Texas Register, Volume 40, Number 25, June 19, 2015, TexReg 3990, eff. 6/25/2015