30 Tex. Admin. Code § 117.1254

Current through Reg. 49, No. 38; September 20, 2024
Section 117.1254 - Final Control Plan Procedures for Attainment Demonstration Emission Specifications
(a) The owner or operator of utility boilers listed in § 117.1200 of this title (relating to Applicability) at a major source of nitrogen oxides (NOX) shall submit to the executive director a final control report to show compliance with the requirements of § 117.1210 of this title (relating to Emission Specifications for Attainment Demonstration). The report must include:
(1) the section under which NOX compliance is being established for the utility boilers within the electric generating system, either:
(A) Chapter 101, Subchapter H, Division 3 of this title (relating to Mass Emissions Cap and Trade Program); and
(B) § 117.1220 of this title (relating to System Cap); and as applicable,
(C) § 117.9800 of this title (relating to Use of Emission Credits for Compliance).
(2) the methods of NOX control for each utility boiler;
(3) the emissions measured by testing required in § 117.1235 of this title (relating to Initial Demonstration of Compliance);
(4) the submittal date, and whether sent to the Austin or the regional office (or both), of any compliance stack test report or relative accuracy test audit report required by § 117.1235 of this title that is not being submitted concurrently with the final compliance report; and
(5) the specific rule citation for any utility boiler with a claimed exemption from the emission specifications of § 117.1210 of this title.
(b) For sources complying with § 117.1220 of this title, in addition to the requirements of subsection (a) of this section, the owner or operator shall submit:
(1) the calculations used to calculate the 30-day average and maximum daily system cap allowable emission rates;
(2) a list containing, for each unit in the cap:
(A) the average daily heat input, Hi, specified in § 117.1220(c)(1) of this title;
(B) the maximum daily heat input, Hmi, specified in § 117.1220(c)(2) of this title;
(C) the method of monitoring emissions; and
(D) the method of providing substitute emissions data when the NOX monitoring system is not providing valid data; and
(3) an explanation of the basis of the values of H i and Hmi.
(c) The report must be submitted by the applicable date specified for final control plans in § 117.9120 of this title (relating to Compliance Schedule for Houston-Galveston-Brazoria Ozone Nonattainment Area Utility Electric Generation Sources). The plan must be updated with any emission compliance measurements submitted for units using continuous emissions monitoring system or predictive emissions monitoring system and complying with the system cap rolling 30-day average emission limit, according to the applicable schedule given in § 117.9120 of this title.

30 Tex. Admin. Code § 117.1254

The provisions of this §117.1254 adopted to be effective June 14, 2007, 32 TexReg 3206