30 Tex. Admin. Code § 117.1056

Current through Reg. 49, No. 38; September 20, 2024
Section 117.1056 - Revision of Final Control Plan

A revised final control plan may be submitted by the owner or operator, along with any required permit applications. Such a plan must adhere to the emission specification and the final compliance dates of this division (relating to Beaumont-Port Arthur Ozone Nonattainment Area Utility Electric Generation Sources). For sources complying with §§ 117.1005, 117.1010, or 117.1015 of this title (relating to Emission Specifications for Reasonably Available Control Technology (RACT); Emission Specifications for Attainment Demonstration; and Alternative System-Wide Emission Specifications), replacement new units may be included in the control plan. The revision of the final control plan is subject to the review and approval of the executive director.

30 Tex. Admin. Code § 117.1056

The provisions of this §117.1056 adopted to be effective June 14, 2007, 32 TexReg 3206