30 Tex. Admin. Code § 117.356

Current through Reg. 49, No. 25; June 21, 2024
Section 117.356 - Revision of Final Control Plan

A revised final control plan may be submitted by the owner or operator, along with any required permit applications. Such a plan must adhere to the requirements and the final compliance dates of this division (relating to Houston-Galveston-Brazoria Ozone Nonattainment Area Major Sources).

(1) For sources complying with § 117.305 of this title (relating to Emission Specifications for Reasonably Available Control Technology (RACT)), § 117.310 of this title (relating to Emission Specifications for Attainment Demonstration), or § 117.315 of this title (relating to Alternative Plant-Wide Emission Specifications), replacement new units may be included in the control plan.
(2) For sources complying with § 117.323 of this title (relating to Source Cap), any new unit must be included in the source cap, if the unit belongs to an equipment category that is included in the source cap.
(3) The revision of the final control plan must be subject to the review and approval of the executive director.

30 Tex. Admin. Code § 117.356

The provisions of this §117.356 adopted to be effective June 14, 2007, 32 TexReg 3206