30 Tex. Admin. Code § 117.156

Current through Reg. 49, No. 25; June 21, 2024
Section 117.156 - Revision of Final Control Plan

A revised final control plan may be submitted by the owner or operator, along with any required permit applications. Such a plan must adhere to the emission specifications and the final compliance dates of this division (relating to Beaumont-Port Arthur Ozone Nonattainment Area Major Sources).

(1) For sources complying with § 117.105 of this title (relating to Emission Specifications for Reasonably Available Control Technology (RACT)), § 117.110 of this title (relating to Emission Specifications for Attainment Demonstration), or § 117.115 of this title (relating to Alternative Plant-Wide Emission Specifications), replacement new units may be included in the control plan.
(2) For sources complying with § 117.123 of this title (relating to Source Cap), any new unit must be included in the source cap, if the unit belongs to an equipment category that is included in the source cap.
(3) The revision of the final control plan is subject to the review and approval of the executive director.

30 Tex. Admin. Code § 117.156

The provisions of this §117.156 adopted to be effective June 14, 2007, 32 TexReg 3206