16 Tex. Admin. Code § 4.293

Current through Reg. 50, No. 1; January 3, 2025
Section 4.293 - [Effective 7/1/2025] Permit Renewal

Before the expiration of a permit issued pursuant to this division, the permittee may submit an application to renew the permit on a Commission prescribed form. An application for renewal of an existing permit issued pursuant to this division shall be submitted in writing a minimum of 60 days before the expiration date of the permit and shall include the permittee's permit number. The application shall comply with the requirements of § 4.278 of this title (relating to General Permit Application Requirements for a Stationary Commercial Fluid Recycling Facility), and the notice requirements of § 4.286 of this title (relating to Notice). The Director may require the applicant to comply with any of the requirements of §§ 4.279 - 4.285 of this title (relating to Minimum Engineering and Geologic Information; Minimum Siting Information; Minimum Real Property Information; Minimum Design and Construction Information; Minimum Operating Information; Minimum Monitoring Information; and Minimum Closure Information), depending on any changes made or planned to the construction, operation, monitoring, and/or closure of the facility.

16 Tex. Admin. Code § 4.293

The provisions of this §4.293 adopted to be effective April 15, 2013, 38 TexReg 2334; Amended by Texas Register, Volume 50, Number 01, January 3, 2025, TexReg 0098, eff. 7/1/2025