16 Tex. Admin. Code § 12.563

Current through Reg. 49, No. 38; September 20, 2024
Section 12.563 - Subsidence Control: Public Notice

The mining schedule shall be distributed by mail to all owners of property and residents within the area above the underground workings and adjacent areas. Each such person shall be notified by mail at least six months prior to mining beneath his or her property or residence. The notification shall contain, as a minimum:

(1) identification of specific areas in which mining will take place;
(2) dates of mining activities that could cause subsidence and affect specific structures; and
(3) measures to be taken to prevent or control adverse surface effects.

16 Tex. Admin. Code § 12.563

The provisions of this §12.563 adopted to be effective April 7, 1997, 22 TexReg 3093.