Current through Reg. 50, No. 1; January 3, 2025
Section 6.5 - Application Intake and Frequency of Determining Customer Eligibility(a) Subrecipient shall: (1) Accept applications at sites that are geographically accessible to all Households in their Service Area (Applications may be accepted online if so elected by the Subrecipient, but must have a physical location within the Service Area); and(2) Provide a Household who has insufficient means to travel to an application intake site, are physically infirm, or are technically unable to submit applications electronically (e.g., computer illiterate, insufficient equipment, disability that prevents submitting the application) with an alternative means to submit an application.(b) For CEAP and CSBG, income must be verified with a new application at least every twelve months.(c) For WAP, income must be verified at the initial application. If the customer is on a wait-list for over 12 months since initial application, Household income must be updated within at least 12 months of the Dwelling Unit work start date, as defined within program forms.10 Tex. Admin. Code § 6.5
Adopted by Texas Register, Volume 41, Number 48, November 25, 2016, TexReg 9276, eff. 12/4/2016; Amended by Texas Register, Volume 42, Number 31, August 4, 2017, TexReg 3872, eff. 8/7/2017; Adopted by Texas Register, Volume 44, Number 52, December 27, 2019, TexReg 8250, eff. 1/1/2020; Adopted by Texas Register, Volume 46, Number 48, November 26, 2021, TexReg 8013, eff. 12/2/2021; Adopted by Texas Register, Volume 49, Number 52, December 27, 2024, TexReg 10512, eff. 1/1/2025