Current through October 22, 2024
Section 0720-43-.04 - APPROVAL OF PLANS(1) Plans and specifications submitted pursuant to these rules shall be approved only if the proposed construction would be in compliance with the minimum standards of fire prevention, fire protection, and building construction safety in effect at the time of initial submission.(2) No final approval of plans and specifications shall be valid unless the construction represented by such plans and specifications has substantially progressed within twelve (12) months after the effective date of any adopted revisions of the building or codes standards in effect at the time of initial submission.(3) A copy of the approved plans and specifications shall be retained on the job site through completion of the project and final inspection.(4) Construction shall proceed in accordance with the plans and specifications as approved hereunder. If construction is completed in accordance with the approved plans and specifications, the building represented by such plans and specifications shall be exempt from subsequently adopted standards of fire prevention, fire protection, and building construction safety, unless the non-conformity of the building to such standards poses a serious life safety hazard.(5) No approval of, or failure to review, plans and specifications by the Department shall relieve the owner, developer, designing architect or engineer of their respective responsibilities for compliance with applicable laws, rules or codes respecting fire prevention, fire protection, and building construction safety.Tenn. Comp. R. & Regs. 0720-43-.04
Original rule filed April 10, 2000; effective June 24, 2000. Transferred from chapter 1200-24-05 pursuant to Public Chapter 1119 of 2022 effective 7/1/2022.Authority: T.C.A. §§ 4-5-202, 68-11-202, 68-11-204, 68-11-206, 68-11-209, and 68-11-216.