All other categories of secondary recovery and pressure maintenance projects shall be approved by special order, after a public hearing and by determination of the Board that waste shall be prevented and the unit operation shall increase ultimate recovery; that the unit operation is feasible; that each owner shall receive his just and equitable share; and that 50% or more of the owners have approved the unit operation.
Tenn. Comp. R. & Regs. 0400-54-09-.03
Authority: T.C.A §§ 60-1-201 et seq., and 4-5-201 et seq.