Wells that are gas-lifted with gas from gas wells shall be prorated in the same manner as are high-ratio naturally flowing oil wells after subtracting the input gas from the output gas. The uneconomical or unreasonable use of gas for gas-lifting shall not be permitted.
Tenn. Comp. R. & Regs. 0400-54-07-.05
Authority: T.C.A §§ 60-1-201 et seq., and 4-5-201 et seq.