All wells drilled in connection with the production of oil and gas, unless plugged in accordance with well abandonment procedures as stated in Chapter 0400-52-09, shall be completed within 1 year from cessation of drilling unless the operator is following the procedures outlined in Rule 0400-52-09-.06 Temporary Abandonment.
Tenn. Comp. R. & Regs. 0400-53-01-.01
Authority: T.C.A §§ 60-1-201 et seq., and 4-5-201 et seq.