Tenn. Comp. R. & Regs. 0400-52-06-.01

Current through October 22, 2024
Section 0400-52-06-.01 - DRILLING EQUIPMENT

All drilling equipment shall be designed, constructed, and operated in such a manner so as to prevent accidents and insure safe operating practices. It is recommended that each operator require the drilling contractor to comply with the general rules and safety procedures of the industry.

Tenn. Comp. R. & Regs. 0400-52-06-.01

Original rule filed March 20, 2013; effective June 18, 2013.

Authority: T.C.A §§ 60-1-201 et seq., and 4-5-201 et seq.