(i) | Projects with 5 or more points of impact and requiring compensatory mitigation | $5,000 |
(ii) | Projects not requiring compensatory mitigation, any number of impact points | $2,500 |
(iii) | Projects with less than 5 points of impact, with or without mitigation requirements | $2,500 |
(iv) | Watershed District Projects | $1,000 |
(v) | Projects seeking Notice of Coverage under a general permit | $500 |
(Note: Multiple impact points may be covered under one general permit provided the impacts are of the same general permit type, such that each impact would be subject to identical general permit conditions, and provided the cumulative degradation or other aspect of the activities does not require coverage under an individual permit.)
For the purposes of part 1 of this subparagraph, points of impact shall mean discreet physical locations on one or more jurisdictional water features within an overall project (common plan of development), at which regulated alteration activities are proposed.
(i) | Projects equal to or greater than 150 acres | $10,000 |
(ii) | Projects equal to or greater than 50 acres and less than 150 acres | $6,000 |
(iii) | Projects equal to or greater than 20 acres and less than 50 acres | $3,000 |
(iv) | Projects equal to or greater than 5 acres and less than 20 acres | $1,000 |
(v) | Projects equal to or greater than 1 acre and less than 5 acres | $250 |
(vi) | Projects seeking subsequent coverage under an actively covered larger common plan of development or sale | $100 |
(i) | Systems greater than 0.075 MGD | $1,000 plus $150 for each additional 0.02 MGD |
(ii) | Systems greater than 0.05 MGD and less than 0.075 MGD | $1,000 |
(iii) | Systems greater than 0.02 MGD and less than 0.05 MGD | $750 |
(iv) | Systems less than 0.02 MGD | $500 |
1. | Gravel Dredging | $300 |
2. | Gravel Dredging for Personal Residence or Family Farm | $0 |
3. | Major Industrial Treatment Facility: | |
(i) Flow equal to or greater than 10 MGD | $10,380 | |
(ii) Flow equal to or greater than 1 MGD and less than 10 MGD | $8,650 | |
(iii) Flow equal to or greater than 0.5 MGD and less than 1 MG | $6,920 | |
(iv) Flow equal to or greater than 0.1 MGD and less than 0.5 MGD | $5,190 | |
(v) Flow less than 0.1 MGD | $3,460 | |
4. | Minor Industrial Treatment Facility: | |
(i) Flow equal to or greater than 10 MGD | $6,920 | |
(ii) Flow equal to or greater than 1 MGD and less than 10 MGD | $5,190 | |
(iii) Flow equal to or greater than 0.5 MGD and less than 1 MGD | $3,460 | |
(iv) Flow equal to or greater than 0.1 MGD and less than 0.5 MGD | $1,380 | |
(v) Flow less than 0.1 MGD | $690 | |
5. | Treated Wastewater Dischargers with flows [LESS THAN] 0.001MGD | $140 |
6. | Stormwater Discharge Permits associated with Industrial Activities: | |
(i) Facilities equal to or greater than 500 acre | $970 | |
(ii) Facilities equal to or greater than 400 acres and less than 500 acres | $900 | |
(iii) Facilities equal to or greater than 300 acres and less than 400 acres | $830 | |
(iv) Facilities equal to or greater than 200 acres and less than 300 acres | $760 | |
(v) Facilities equal to or greater than 100 acres and less than 200 acres | $690 | |
(vi) Facilities equal to or greater than 50 acres and less than 100 acres | $620 | |
(vii) Facilities equal to or greater than 25 acres and less than 50 acres | $550 | |
(viii) Facilities equal to or greater than 10 acres and less than 25 acres | $480 | |
(ix) Facilities equal to or greater than 5 acres and less than 10 acres | $420 | |
(x) Facilities equal to or greater than 1 acres and less than 5 acres | $350 | |
(xi) Facilities equal to or greater than 0 acres and less than 1 acre | $0 | |
7. | Sewage Treatment Facility Flow: | |
(i) Flow equal to or greater than 5 MGD | $10,380 | |
(ii) Flow equal to or greater than 4.5 MGD and less than 5 MGD | $10,030 | |
(iii) Flow equal to or greater than 4 MGD and less than 4.5 MGD | $9,690 | |
(iv) Flow equal to or greater than 3.5 MGD and less than 4 MGD | $9,340 | |
(v) Flow equal to or greater than 3 MGD and less than 3.5 MGD | $9,000 | |
(vi) Flow equal to or greater than 2.5 MGD and less than 3 MGD | $8,300 | |
(vii) Flow equal to or greater than 2 MGD and less than 2.5 MGD | $7,610 | |
(viii) Flow equal to or greater than 1.5 MGD and less than 2 MGD | $6,920 | |
(ix) Flow equal to or greater than 1 MGD and less than 1.5 MGD | $6,230 | |
(x) Flow equal to or greater than 0.75 MGD and less than 1 MGD | $5,540 | |
(xi) Flow equal to or greater than 0.5 MGD and less than 0.75 MGD | $4,840 | |
(xii) Flow equal to or greater than 0.25 MGD and less than 0.5 MGD | $3,460 | |
(xiii) Flow equal to or greater than 0.1 MGD and less than 0.25 MGD | $1,730 | |
(xiv) Flow equal to or greater than 0.075 MGD and less than 0.1 MGD | $1,040 | |
8. | Small Mechanical Facility flow less than 0.075 MGD | $690 |
9. | Small Non-Mechanical Facility flow less than 0.075 MGD | $350 |
10. | Non-Discharging Facility: | |
(i) Influent flow equal to or greater than 0.5 MGD | $4,840 | |
(ii) Influent flow equal to or greater than 0.1 MGD and less than 0.5 MGD | $2,770 | |
(iii) Influent flow equal to or greater than 0.075 MGD and less than 0.1 MGD | $1,380 | |
(iv) Influent flow less than 0.075 MGD | $350 | |
(v) Satellite collection systems | $1,380 | |
(vi) Pump and haul | $350 | |
11. | Other Waste or Wastewater Operations Requiring Permit | $1,380 |
12. | General Permits | |
(i) For construction activities that exceed one year under general permit coverage: | ||
(I) Projects equal to or greater than 150 acres | $3,750 | |
(II) Projects equal to or greater than 50 acres and less than 150 acres | $2,000 | |
(III) Projects equal to or greater than 20 acres and less than 50 acres | $1,000 | |
(IV) Projects equal to or greater than 5 acres and less than 20 acres | $500 | |
(V) Projects equal to or greater than 1 acre and less than 5 acres | $125 | |
(ii) For minor activities that require no notification to obtain general permit coverage, recreational prospecting for gold or other precious and semiprecious ores, metals and minerals, or concentrated animal feeding operations | $0 | |
(iii) All other activities | $350 | |
13. | Concentrated animal feeding operations covered by an individual permit | $350 |
14. | Municipal Pretreatment Programs as defined in subparagraph (2)(a) 0400-40-11-.01: | of Rule |
(i) Large Pretreatment Program | $6,920 | |
(ii) Medium Pretreatment Program | $4,150 | |
(iii) Small Pretreatment Program | $1,380 | |
15. | Mining: | |
(i) Area equal to or greater than 500 acres | $6,920 | |
(ii) Area equal to or greater than 400 acres and less than 500 acres | $6,230 | |
(iii) Area equal to or greater than 300 acres and less than 400 acres | $5,540 | |
(iv) Area equal to or greater than 200 acres and less than 300 acres | $4,840 | |
(v) Area equal to or greater than 100 acres and less than 200 acres | $4,150 | |
(vi) Area equal to or greater than 75 acres and less than 100 acres | $3,460 | |
(vii) Area equal to or greater than 50 acres and less than 75 acres | $2,770 | |
(viii) Area equal to or greater than 25 acres and less than 50 acres | $2,080 | |
(ix) Area equal to or greater than 10 acres and less than 25 acres | $1,380 | |
(x) Area equal to or greater than 5 acres and less than 10 acres | $1,040 | |
(xi) Area less than 5 acres $690 | ||
(Note: Fees are based on area being mined or area not yet reclaimed.) | ||
16. | Mining Reclamation | $350 |
17. | Stormwater Discharge Permits for Municipal Separate Storm Sewer Systems (MS4): | |
(i) Large MS4s | $10,380 | |
(ii) Medium MS4s | $6,920 | |
(iii) Small MS4s | $3,460 | |
18. | 401 Certification or ARAP permits that require monitoring of permitted activities or compensatory mitigation | $500 |
19. | Water Withdrawal ARAP permits that require monthly operational reports, provided an annual maintenance fee has not been paid under Rule 0400-45-01-.32 | $1,000 |
1. | Major Industrial Wastewater Treatment Facility: | |
(i) Flow equal to or greater than 5 MGD | $1,500 | |
(ii) Flow less than 5 MGD | $1,000 | |
2. | Minor Industrial Wastewater Treatment Facility: | |
(i) Flow equal to or greater than 0.1 MGD | $ 500 | |
(ii) Flow less than 0.1 MGD | $ 250 | |
3. | Sewage Treatment Facility: | |
(i) Flow equal to or greater than 5 MGD | $1,500 | |
(ii) Flow equal to or greater than 1 MGD and less than 5 MGD | $1,000 | |
(iii) Flow equal to or greater than 0 .075 MGD and less than 1 MGD | $ 500 | |
(iv) Flow less than 0.075 MGD | $ 250 | |
4. | Collection Systems or Force Main: $25.00 per 250 feet or portion thereof of sewage collection line or force main excluding service laterals. Total fee not to exceed $1,500. | |
5. | Equalization Basins: | |
(i) Holding capacity equal to or greater than 5 million gallons (MG) | $ 300 | |
(ii) Holding capacity equal to or greater than 1 MG and less than 5 MG | $ 200 | |
(iii) Holding capacity equal to or greater than 0.075 MG and less than 1 MG | $ 100 | |
(iv) Holding capacity less than 0.075 MG | $ 50 | |
6. | Pumping Stations: | |
(i) Design capacity equal to or greater than 5 MGD | $ 300 | |
(ii) Design capacity equal to or greater than 1 MGD and less than 5 MGD | $ 200 | |
(iii) Design capacity equal to or greater than 0.075 MGD and less than 1 MGD | $ 100 | |
(iv) Design capacity less than 0.075 MGD (Does not include grinder pumps for septic tanks and septic tank effluent pumps) | $ 50 | |
7. | Mining Operations: | |
(i) Coal | $ 250 | |
(ii) Non-Coal - $25.00 per acre, not to exceed | $1,500 | |
(iii) Reclamation | $ 250 | |
(iv) Quarries | $ 250 | |
8. | Wastewater Plant and/or Collection System Modification: The plans review fee for modifications to wastewater plants and/or collection systems shall be 20% of the full review fee based on the category and size of the resulting facility. |
Units of local government, which have been granted plans review authority, shall pay an annual fee of $1,000. Failure of local government to pay this fee will be cause for the revocation of plans review authority.
1. | Major Industrial Wastewater Treatment Facility: | |
(i) Flow equal to or greater than 5 MGD | $1,500 | |
(ii) Flow less than 5 MGD | $1,000 | |
2. | Minor Industrial Wastewater Treatment Facility: | |
(i) Flow equal to or greater than 0.1 MGD | $500 | |
(ii) Flow less than 0.1 MGD | $250 | |
3. | Sewage Treatment Facility: | |
(i) Flow equal to or greater than 5 MGD | $1,500 | |
(ii) Flow equal to or greater than 1 MGD and less than 5 MGD | $1,000 | |
(iii) Flow equal to or greater than 0.075 MGD and less than 1 MGD | $500 | |
(iv) Flow less than 0.075 MGD | $250 |
Tenn. Comp. R. & Regs. 0400-40-11-.02
Authority: T.C.A. §§ 69-3-101 et seq., 68-203-101 et seq, and 4-5-201 et seq.