The owner or operator of an existing municipal solid waste landfill that meets the requirements of § 74:36:07:105 shall place each well or design components as specified in the approved design plan as provided in § 74:36:07:126. Each well shall be installed no later than 60 days after the date on which the initial solid waste has been in place for a period of:
S.D. Admin. R. 74:36:07:113
General Authority: SDCL 34A-1-6.
Law Implemented: SDCL 34A-1-18.