S.D. Admin. R. 74:27:12:22

Current through Register Vol. 51, page 62, December 2, 2024
Section 74:27:12:22 - Construction quality assurance plan

The applicant shall develop a construction quality assurance plan that addresses all aspects of facility construction. The plan shall include the following:

(1) A description of the responsibilities and authorities of key personnel;
(2) A description of the required level of experience, training, and duties of the contractor, the contractor's crew, and the quality assurance inspectors;
(3) A description of the testing protocols for every major phase of construction, including the frequencies of inspections, field testing, and sampling for laboratory testing;
(4) The sampling and field testing procedures and the equipment to be used;
(5) The calibration of field testing equipment;
(6) The laboratory procedures to be used; and
(7) Documentation to be maintained.

S.D. Admin. R. 74:27:12:22

17 SDR 8, effective 7/26/1990; 19 SDR 186, effective 6/10/1993.

General Authority: SDCL 34A-6-1.6.

Law Implemented: SDCL 34A-6-1.6.