Following installation of piping for the vertical closed loop, the hole shall be filled with bentonite grout from the bottom to the ground surface.
S.D. Admin. R. 74:02:04:39
General Authority: SDCL 46-2-5, 46-6-20, 46-6-27.
Law Implemented: SDCL 46-6-6.1, 46-6-10, 46-6-20, 46-6-27.