For underground systems, the drawings shall show the location and capacity of each tank, and the class of liquid to be stored in the tanks, together with the clearances and requirements and the location of fill, gauge, and vent pipes and other openings.
S.D. Admin. R. 61:15:03:04
General Authority: SDCL 34-29B-2, 34-38-35.
Law Implemented: SDCL 34-29B-2, 34-38-24, 34-38-25.
Conformity with national standards, § 61:15:01:01.