Section 31:02:01:08 - Default Any of the following constitutes a default upon the terms of an ethanol infrastructure incentive program grant:
(1) Any part of a grant application is shown to be materially false or misleading;(2) Any part of the grant is used for any purpose other than reimbursement for eligible project costs;(3) The grantee fails to commence or complete the project within the time allowed by this chapter;(4) For projects involving the installation of ethanol blender pumps, the grantee fails to continue to sell ethanol blends in excess of fifteen percent ethanol for a minimum of twenty-four months after project completion; or(5) Repeated failure by the grantee to provide access to facilities or documents or to provide the reports and other information required by this chapter.S.D. Admin. R. 31:02:01:08
38 SDR 115, effective 1/9/2012.General Authority: SDCL 10-47B-164.1, 10-47B-164.2.