S.D. Admin. R. 20:44:25:06

Current through Register Vol. 50, page 162, June 24, 2024
Section 20:44:25:06 - Switch requirements

The switch or switches installed in the cogeneration system as required by power supplier systems must be so arranged that only authorized persons have control of these switches. Authorized persons shall be designated by the power supplier system.

S.D. Admin. R. 20:44:25:06

10 SDR 131, effective 6/3/1984; 12 SDR 151, 12 SDR 155, effective 7/1/1986; 20 SDR 222, effective 7/6/1994; transferred from

General Authority: SDCL 36-16-12.

Law Implemented: SDCL 36-16-27.