Current through Register Vol. 51, page 71, January 6, 2025
Section 20:25:01:01 - DefinitionsTerms defined in SDCL 49-7A-1 have the same meaning when used in this article. Terms used in this article mean:
(1) "Excavation site," the specific location where an excavation will occur;(2) "High profile underground facility," a high profile underground facility is any: (a) High pressure natural gas pipeline with a maximum allowable operating pressure greater than three hundred pounds per square inch (psi);(b) Natural gas transmission facility in a high consequence area as defined in 49 C.F.R. § 192.903 (October 1, 2009);(d) Hazardous material pipeline;(e) High-voltage electric supply line, conductor, or cable that has a potential to ground of greater than or equal to sixty kilovolts; or(f) Underground facility that, if damaged, has the potential for significant public safety, economic, or environmental impact;(3) "Informational locate request," a request to the one-call notification center for locating underground facilities for planning, permit, surveying, mapping, or design work that is not related to planned excavation activity within the next eighteen months;(4) "Normal business hours," 8:00 a.m. to 5:00 p.m., Monday through Friday, excluding holidays as provided in SDCL 1-5-1;(5) "Notification time," the time at the end of the telephone locate request when the answering attendant provides the excavator with a confirmation number or the time a nontelephonic locate request is received by the center;(6) "Planned excavation locate request," a request to the center for locating underground facilities for planning, permit, or design work relative to specific excavation activity planned to start within the next eighteen months;(7) "Planner," any person who prepares a drawing for a planned construction or other project which will require excavation at a future date;(8) "Positive response," an operator's electronically provided status update on locates requested by excavators;(9) "Respond," the facility operator's mark or other means of physically identifying the location of underground facilities if the facility operator operates any underground facilities in the area of the proposed excavation;(10) "Routine locate request," a communication between an excavator and the one-call notification center to request locating underground facilities for excavation activity; and(11) "Ticket," a document issued by the one-call notification center to operators and excavators for the purpose of locating an underground facility.S.D. Admin. R. 20:25:01:01
21 SDR 27, effective 8/21/1994; 26 SDR 161, effective 6/8/2000; 29 SDR 111, effective 2/12/2003; 34 SDR 180, effective 12/24/2007; 36 SDR 96, adopted November 19, 2009, effective 5/1/2010; 51 SDR 066, effective 12/29/2024General Authority: SDCL 49-7A-4
Law Implemented: SDCL 49-7A-1, 49-7A-2