S.D. Admin. R. 20:10:39:23

Current through Register Vol. 50, page 159, June 17, 2024
Section 20:10:39:23 - Inspection, repair, and measurement requirements

Prior to testing, the utility transformer is inspected, grounding electrode resistance measured, and any repairs necessary for safety are made and recorded. In the case of a customer-owned transformer, qualified personnel shall inspect the installation, measure grounding electrode resistance, and make and record any repairs necessary for safety. Measurements that require contact with utility or customer-owned primary wires or equipment are made by the utility or other qualified personnel.

S.D. Admin. R. 20:10:39:23

42 SDR 174, effective 6/21/2016

General Authority: SDCL 49-47-2.

Law Implemented: SDCL 49-47-2, 49-47-3.