S.D. Admin. R. 20:01:12:02

Current through Register Vol. 51, page 57, November 12, 2024
Section 20:01:12:02 - Standards of new manufactured homes

All new manufactured homes must be installed in accordance with the manufacturer's installation instructions. The manufactured home installer must install a tie-down system in accordance with the manufacturer's installation instructions within 180 days after the date of delivery.

S.D. Admin. R. 20:01:12:02

23 SDR 96, effective 12/16/1996.

General Authority: SDCL 34-34A-9.3, 34-34A-19.

Law Implemented: SDCL 34-34A-9.3.