Current through Register Vol. 48, No. 10, October 25, 2024
Section 71-5600 - Fee Schedules1. Construction Permits A. The fee for a construction permit shall include the fee for registration and the first annual operating certificate of a facility Contract Price/Per Facility | Fee |
$1 -$ 10,000 | $250.00 |
$ 10,001 -$30,000 | $295.00 |
$30,001 -$50,000 | $345.00 |
$50,001 -$80,000 | $390.00 |
$80,001 -$ 100,000 | $410.00 |
$100,001-$200,000 | $460.00 |
$200,001-and up | $510.00 |
B. Fees under 71-5600 include one turn-over inspection. Any return turn-over inspection, for failing to comply, will be charged at a rate of $75.00 per hour including travel time.C. A fee of $250.00 will be charged upon issuance of atemporary certificate, good for aperiod of no more than sixty (60) days. At the end of sixty (60) days the owner may a) apply for a renewal of atemporary certificate with a fee of $250.00; b) have the elevator ready for a complete turnover inspection; or c) remove the elevator from service. 2. Operating Certificate: A.(1) The fee for an annual operating certificate, after registration, whether initial or renewal, with inspection by the South Carolina Department of Labor, Licensing and Regulation shall be as follows: Number of Floors | Fee |
2to5........................................................ | $125.00 |
6 to 12...................................................... | .$150.00 |
13 and above.............................................. | $175.00 |
(2) The fee for an operating certificate, after registration whether initial or renewal, with inspection by the South Carolina Department of Labor, Licensing and Regulation shall be as follows: Type of Elevator | Fee |
Handicap lifts............................................ | .$75.00 every five years |
Manlifts................................................... | .$200.00 every seven years |
Television tower.......................................... | $300.00 every seven years |
Special Purpose Personnel Elevators:
2-5 floors............................................ | .$125.00 every seven years |
6-12 floors................................................... | .$150.00 every seven years |
13 and above floors.......................................... | $175.00 every seven years |
B. The fee for an annual operating certificate, after registration, whether initial or renewal, upon report of a special inspection shall be $50.00 per facility.C. The fee for a reinspection due to failure to make timely corrections of all deficiencies noted in an annual inspection report will be $75.00 per hour of inspection time, including travel time.3. License for Special Inspector: A. The fee for an annual license as a special inspector shall be $200.00.S.C. Code Regs. § 71-5600
Added by State Register Volume 10, Issue No. 6, dated June 27, 1986, eff July 1, 1986. Amended by State Register Volume 11, Issue No. 6, eff June 26, 1987; State Register Volume 12, Issue No. 5, eff May 27, 1988; State Register Volume 13, Issue No. 5, eff May 26, 1989; State Register Volume 17, Issue No. 5, Part 3, eff May 28, 1993; State Register Volume 27, Issue No. 6, Part 2, eff June 27, 2003; State Register Volume 28, Issue No. 3, eff March 26, 2004; State Register Volume 42, Issue No. 05, eff. 5/25/2018.