Prequalification will be based on a verified showing of experience, responsibility record, and available equipment. A prerequisite to prequalification will be a sworn statement furnished to the Department by the applicant. The statement must be made on a form provided by the Department of Transportation and must include all information required by the Department.
Contractors making application for prequalification for the first time must file their statements with the Department at least seven (7) days prior to the date on which they desire to become qualified for bidding.
S.C. Code Regs. § 63-301