The notification/application, work practice, air sampling, clean-up, and disposal requirements of this Section shall apply to each abatement project where the combined amount of RACM to be stripped, removed, dislodged, cut, drilled, or similarly disturbed is more than 25 but fewer than 260 linear feet on pipes, or more than 25 but fewer than 160 square feet on other facility components, or more than ten but fewer than 35 cubic feet of RACM off of facility components such that area or length could not be measured prior to abatement.
In a facility being renovated subject to this Section, the owner/operator shall provide the Department with written notification prior to any abatement and pay all applicable fees as follows:
The facility owner shall ensure that air sampling is performed in accordance with applicable requirements of the Air Sampling Section of this regulation.
The owner/operator shall comply with the requirements of the Disposal Section of this regulation.
S.C. Code Regs. § 61-86.1.XI