Current through Register Vol. 48, No. 10, October 25, 2024
Section 61-82.V - Procedures applicable to all closeouts1. A request for site inspection for closeout shall be made by the responsible official to DHEC.2. A site inspection shall be conducted by DHEC and authorization to proceed with closeout granted by DHEC.3. Monitoring as deemed necessary by DHEC to prevent water quality violations or nuisance conditions will be established on a case-by-case basis and carried out in accordance with DHEC guidance.4. Upon completion of closeout the responsible party shall request an inspection by DHEC. The results of the inspection shall be reduced to writing and forwarded to the responsible official approving or disapproving the closeout. In cases of disapproval discrepancies shall be noted and a follow-up inspection scheduled.5. Closeout will be considered accomplished only after approval in writing from DHEC.6. Areas around all waste treatment facilities undergoing closeout shall remain secured until closeout has been accomplished. In an instance of package plant closeout, the plant shall remain secured until electrical power has been disconnected and the plant is removed from the premises and depressions resulting from the removal of the system filled.S.C. Code Regs. § 61-82.V