S.C. Code Regs. § § 61-79.270.H.105

Current through Register Vol. 48, 12, December 27, 2024
Section 61-79.270.H.105 - Who must sign the application and any required reports for a RAP?

Both the owner and the operator must sign the RAP application and any required reports according to 270.11(a), (b), and (c). In the application, both the owner and the operator must also make the certification required under 270.11(d)(1). However, the owner may choose the alternative certification under 270.11(d)(2) if the operator certifies under 270.11(d)(1).

S.C. Code Regs. § 61-79.270.H.105

Added by State Register Volume 24, Issue No. 8, eff August 25, 2000.