Section 61-79.265.M.272 - General operating requirements
(a) Hazardous waste must not be placed in or on a land treatment facility unless the waste can be made less hazardous or non-hazardous by degradation, transformation, or immobilization processes occurring in or on the soil.
(b) The owner or operator must design, construct, operate, and maintain a run-on control system capable of preventing flow onto the active portions of the facility during peak discharge from at least a 25-year storm.
(c) The owner or operator must design, construct, operate, and maintain a run-off management system capable of collecting and controlling a water volume at least equivalent to a 24-hour 25-year storm.
(d) Collection and holding facilities (e.g., tanks or basins) associated with run-on and run-off control systems must be emptied or otherwise managed expeditiously after storms to maintain design capacity of the system.
(e) If the treatment zone contains particulate matter which may be subject to wind dispersal, the owner or operator must manage the unit to control wind dispersal.

S.C. Code Regs. 61-79.265.M.272

Amended by State Register Volume 10, Issue No. 1, eff January 24, 1986; State Register Volume 14, Issue No. 11, eff November 23, 1990; State Register Volume 16, Issue No. 12, eff December 25, 1992.