Section 61-79.265.J.197 - Closure and post-closure care
(a) At closure of a tank system, the owner or operator must remove or decontaminate all waste residues, contaminated containment system components (liners, etc.), contaminated soils, and structures and equipment contaminated with waste, and manage them as hazardous waste, unless R.61-79.261.3(d)(d)applies. The closure plan, closure activities, cost estimates for closure, and financial responsibility for tank systems must meet all of the requirements specified in Subparts G and H of this Regulation.
(b) If the owner or operator demonstrates that not all contaminated soils can be practicably removed or decontaminated as required in paragraph (a) of this section, then the owner or operator must close the tank system and perform post-closure care in accordance with the closure and post-closure care requirements that apply to landfills Section265.310. In addition, for the purposes of closure, post-closure, and financial responsibility, such a tank system is then considered to be a landfill, and the owner or operator must meet all of the requirements for landfills specified in Subparts G and H of this Regulation.
(c) If an owner or operator has a tank system which does not have secondary containment that meets the requirements of sections265.193(b) through (f)(b) through (f) and which is not exempt from the secondary containment requirements in accordance with section265.193(g)(g), then,
(1) The closure plan for the tank system must include both a plan for complying with paragraph (a) of this section and a contingent plan for complying with paragraph (b) of this section.
(2) A contingent post-closure plan for complying with paragraph (b) of this section must be prepared and submitted as part of the permit application.
(3) The cost estimates calculated for closure and post-closure care must reflect the costs of complying with the contingent closure plan and the contingent post-closure plan, if these costs are greater than the costs of complying with the closure plan prepared for the expected closure under paragraph (a) of this section.
(4) Financial assurance must be based on the cost estimates in paragraph (c)(3) of this section.
(5) For the purposes of the contingent closure and post-closure plans, such a tank system is considered to be a landfill, and the contingent plans must meet all of the closure, post-closure, and financial responsibility requirements for landfills under Subparts G and H of this Regulation.

S.C. Code Regs. 61-79.265.J.197

Amended by State Register Volume 11, Issue No. 11, eff November 27, 1987; State Register Volume 14, Issue No. 11, eff November 23, 1990; State Register Volume 16, Issue No. 12, eff December 25, 1992.