Current through Register Vol. 48, 12, December 27, 2024
Section 61-79.265.G.112 - Closure plan; amendment of plan(a) Written plan. The owner or operator of a hazardous waste management facility must have a written closure plan. Until final closure is completed and certified in accordance with Section265.115, a copy of the most current plan must be furnished to the Department upon request, including request by mail. In addition, for facilities without approved plans, it must also be provided during site inspections, on the day of inspection, to any officer, employee or representative of the Department.(b) Content of plan. The plan must identify steps necessary to perform partial and/or final closure of the facility at any point during its active life. The closure plan must include, at least: (1) A description of how each hazardous waste management unit at the facility will be closed in accordance with Section265.111; and(2) A description of how final closure of the facility will be conducted in accordance with section265.111. The description must identify the maximum extent of the operations which will be unclosed during the active life of the facility; and(3) An estimate of the maximum inventory of hazardous wastes ever onsite over the active life of the facility and a detailed description of the methods to be used during partial and final closure, including, but not limited to, methods for removing, transporting, treating, storing, or disposing of all hazardous waste, identification of and the type(s) of offsite hazardous waste management unit(s) to be used, if applicable; and(4) A detailed description of the steps needed to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during partial and final closure including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for sampling and testing surrounding soils, and criteria for determining the extent of decontamination necessary to satisfy the closure performance standard; and(5) A detailed description of other activities necessary during the partial and final closure periods to ensure that all partial closures and final closure satisfy the closure performance standards, including, but not limited to, groundwater monitoring, leachate collection, and run-on and run-off control; and(6) A schedule for closure of each hazardous waste management unit and for final closure of the facility. The schedule must include, at a minimum, the total time required to close each hazardous waste management unit and the time required for intervening closure activities which will allow tracking of the progress of partial and final closure. (For example, in the case of a landfill unit, estimates of the time required to treat or dispose of all hazardous waste inventory and of the time required to place a final cover must be included.); and(7) An estimate of the expected year of final closure for facilities that use trust funds to demonstrate financial assurance under Sections265.143 or 265.145 and whose remaining operating life is less than twenty years, and for facilities without approved closure plans.(8) For facilities where the Department has applied alternative requirements at a regulated unit under 265.90(f), and/or 265.110(d), the alternative requirements applying to the regulated unit.(c) Amendment of plan. The owner or operator may amend the closure plan at any time prior to the notification of partial or final closure of the facility. An owner or operator with an approved closure plan must submit a written request to the Department to authorize a change to the approved closure plan. The written request must include a copy of the amended closure plan for approval by the Department. (1) The owner or operator must amend the closure plan whenever:(i) Changes in operating plans or facility design affect the closure plan, or(ii) There is a change in the expected year of closure, if applicable, or(iii) In conducting partial or final closure activities unexpected events require a modification of the closure plan.(iv) The owner or operator requests the Department to apply alternative requirements to a regulated unit under 265.90(f), and/or 265.110(d).(2) The owner or operator must amend the closure plan at least 60 days prior to the proposed change in facility design or operation, or no later than 60 days after an unexpected event has occurred which has affected the closure plan. If an unexpected event occurs during the partial of final closure period, the owner or operator must amend the closure plan no later than 30 days after the unexpected event. These provisions also apply to owners or operators of surface impoundments and waste piles who intended to remove all hazardous wastes at closure, but are required to close as landfills in accordance with Section265.310.(3) An owner or operator with an approved closure plan must submit the modified plan to the Department at least 60 days prior to the proposed change in facility design or operation, or no more than 60 days after an unexpected event has occurred which has affected the closure plan. If an unexpected event has occurred during the partial or final closure period, the owner or operator must submit the modified plan no more than 30 days after the unexpected event. These provisions also apply to owners or operators of surface impoundments and waste piles who intended to remove all hazardous wastes at closure but are required to close as landfills in accordance with Section265.310. If the amendment to the plan is a Class 2 or 3 modification according to the criteria in R.61-79.270.42, the modification to the plan will be approved according to the procedures in Section265.112(d)(4)(d)(4).(4) The Department may request modifications to the plan under the conditions described in paragraph (c)(1) of this section. An owner or operator with an approved closure plan must submit the modified plan within 60 days of the request from the Department, or within 30 days if the unexpected event occurs during partial or final closure. If the amendment is considered a Class 2 or 3 modification according to the criteria in R.61-79.270.42, the modification to the plan will be approved in accordance with the procedures in Section265.112(d)(4)(d)(4). (amended 11/90)(d) Notification of partial closure and final closure. (1) The owner or operator must submit the closure plan to the Department at least 180 days prior to the date on which he expects to begin closure of the first surface impoundment, waste pile, land treatment, or landfill unit, or final closure if it involves such a unit, whichever is earlier. The owner or operator must submit the closure plan to the Department at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace. The owner or operator must submit the closure plan to the Department at least 45 days prior to the date on which he expects to begin final closure of a facility with only tanks, container storage, or incinerator units. Owners or operators with approved closure plans must notify the Department in writing at least 60 days prior to the date on which he expects to begin closure of a surface impoundment, waste pile, landfill, or land treatment unit, or final closure of a facility involving such a unit. Owners or operator with approved closure plans must notify the Department in writing at least 45 days prior to the date on which he expects to begin partial or final closure of a boiler or industrial furnace. Owners or operator with approved closure plans must notify the Department in writing at least 45 days prior to the date on which he expects to begin final closure of a facility with only tanks, container storage, or incinerator units.(2) The date when he "expects to begin closure" must be either: (i) Within 30 days after the date on which any hazardous waste management unit receives the known final volume of hazardous wastes or, if there is a reasonable possibility that the hazardous waste management unit will receive additional hazardous wastes, no later than one year after the date on which the unit received the most recent volume of hazardous wastes. If the owner or operator of a hazardous waste management unit can demonstrate to the Department that the hazardous waste management unit or facility has the capacity to receive additional hazardous wastes and he has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all applicable interim status requirements, the Department may approve an extension to this one-year limit (amended 11/90); or(ii) For units meeting the requirements of 265.113(d), no later than 30 days after the date on which the hazardous waste management unit receives the known final volume of non-hazardous wastes, or if there is a reasonable possibility that the hazardous waste management unit will receive additional non-hazardous wastes, no later than one year after the date on which the unit received the most recent volume of non-hazardous wastes. If the owner or operator can demonstrate to the Department the hazardous waste management unit has the capacity to receive additional non-hazardous wastes and he has taken, and will continue to take, all steps to prevent threats to human health and the environment, including compliance with all applicable interim status requirements, Department may approve an extension to this one-year limit.(3) The owner or operator must submit his closure plan to the Department no later than 15 days after: (i) Termination of interim status except when a permit is issued simultaneously with termination of interim status; or(ii) Issuance of a judicial decree or final order to cease receiving hazardous wastes or close.(4) The Department will provide the owner or operator and the public, through a newspaper notice, the opportunity to submit written comments on the plan and request modifications to the plan no later than 30 days from the date of the notice. The Department will also, in response to a request or at his own discretion, hold a public hearing whenever such a hearing might clarify one or more issues concerning a closure plan. The Department will give public notice of the hearing at least 30 days before it occurs. (Public notice of the hearing may be given at the same time as notice of the opportunity for the public to submit written comments, and the two notices may be combined.) The Department will approve, modify, or disapprove the plan within 90 days of its receipt. If the Department does not approve the plan it shall provide the owner or operator with a detailed written statement of reasons for the refusal and the owner or operator must modify the plan or submit a new plan for approval within 30 days after receiving such written statement. The Department will approve or modify this plan in writing within 60 days. If the Department modifies the plan, this modified plan becomes the approved closure plan. The Department must assure that the approved plan is consistent with sections265.111 through 265.115 and the applicable requirements of subpart F of this part, and 265.197, 265.228, 265.258, 265.280, 265.310, 265.351, 265.381, and 265.404, and 265.1102. A copy of the modified plan with a detailed statement of reasons for the modifications must be mailed to the owner or operator.(e) Removal of wastes and decontamination or dismantling of equipment. Nothing in this Section shall preclude the owner or operator from removing hazardous wastes and decontaminating or dismantling equipment in accordance with the approved partial or final closure plan at any time before or after notification of partial or final closure.S.C. Code Regs. § 61-79.265.G.112
Amended by State Register Volume 11, Issue No. 11, eff November 27, 1987; State Register Volume 14, Issue No. 11, eff November 23, 1990; State Register Volume 16, Issue No. 12, eff December 25, 1992; State Register Volume 17, Issue No. 12, eff December 24, 1993; State Register Volume 21, Issue No. 6, Part 2, eff June 27, 1997; State Register Volume 24, Issue No. 8, eff August 25, 2000.