S.C. Code Regs. § 61-79.265.F.92

Current through Register Vol. 48, No. 5, May 24, 2024
Section 61-79.265.F.92 - Sampling and analysis
(a) The owner or operator must obtain and analyze samples from the installed groundwater monitoring system. The owner or operator must develop and follow a groundwater sampling and analysis plan. The plan must be kept at the facility and must include procedures and techniques for:
(1) Sample collection;
(2) Sample preservation and shipment;
(3) Analytical procedures; and
(4) Chain of custody control.

[Comment: See Procedures Manual For Ground-water Monitoring At Solid Waste Disposal Facilities, EPA-530/SW-611, August 1977 and Methods for Chemical Analysis of Water and Wastes, EPA-600/4-79-020, March 1979 for discussions of sampling and analysis procedures.]

(b) The owner or operator must determine the concentration or value of the following parameters in groundwater samples in accordance with paragraphs (c) and (d) of this section:
(1) Parameters characterizing the suitability of the groundwater as a drinking water supply, as specified in Appendix III.
(2) Parameters establishing groundwater quality:
(i) Chloride
(ii) Iron
(iii) Manganese
(iv) Phenols
(v) Sodium
(vi) Sulfate

[Comment: These parameters are to be used as a basis for comparison in the event a ground-water quality assessment is required under 265.93(d).]

(3) Parameters used as indicators of groundwater contamination:
(i) pH
(ii) Specific Conductance
(iii) Total Organic Carbon
(iv) Total Organic Halogen
(c)
(1) For all monitoring wells, the owner or operator must establish initial background concentrations or values of all parameters specified in paragraph (b) of this Section. He must do this quarterly for one year.
(2) For each of the indicator parameters specified in paragraph (b)(3) of this Section, at least four replicate measurements must be obtained for each sample and the initial background arithmetic mean and variance must be determined by pooling the replicate measurements for the respective parameter concentrations or values in samples obtained from upgradient wells during the first year.
(d) After the first year, all monitoring wells must be sampled and the samples analyzed with the following frequencies:
(1) Samples collected to establish groundwater quality must be obtained and analyzed for the parameters specified in paragraph (b)(2) of this Section at least annually.
(2) Samples collected to indicate groundwater contamination must be obtained and analyzed for the parameters specified in paragraph (b)(3) of this Section at least semi-annually.
(e) Elevation of the groundwater surface at each monitoring well must be determined each time a sample is obtained.

S.C. Code Regs. 61-79.265.F.92

Amended by State Register Volume 14, Issue No. 11, eff November 23, 1990; State Register Volume 17, Issue No. 12, eff December 24, 1993.